My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
08-17-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:59:36 PM
Creation date
1/12/2016 1:58:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
have been obtained. V'iolation of wetland regulations may result in substantial civil and criminal <br /> penalties. Local ordinances may regulate wetland madifications such as brush and tree removal <br /> and burning in addition to grading and filling.Depending on the location of the property, bu�ers <br /> around the wetland may also be protected.Any activities in the proximity of the wetland should <br /> be cleared with appropriate WCA regulatory agencies. It is also advisable to have the wetland <br /> boundary surveyed by a licensed land surveyor. Since the pin flags used along the boundary can <br /> be vandalized or inadvertently knocked over, a GPS survey of the flags will assure the <br /> permanence of the boundary. The client should also be aware that approved wetland boundaries <br /> are typically valid for only three years from the date of approval. <br /> To avoid project delays associated with wetlaad regulations, it is essential that you acquire <br /> necessary permits fram all jurisdictional agencies before initiating activities.A WCA Sequencing <br /> form, a WCA and Army Corps of Engineers Replacement Plan Application form, and a DNR <br /> permit application are among the materials that you may be required to submit if impacts are <br /> propased for the delineated wetlands. By initiating the permit process as soon as possible, <br /> potential costly delays to the project may be avoided. <br /> Svoboda Ec�logicel Resourcxs 7 1700 Shoreline Dr <br /> Project Numbci:20i5-004-03 Orano,MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.