My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
08-17-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:59:36 PM
Creation date
1/12/2016 1:58:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> � Erosion Control Su Iemental Inform ' ,. <br /> � ,p�. .. ahon . <br /> { <br /> � <br /> � <br /> � I+�nal Stabilization will be provided with(seed, sod, etc): O�_ <br /> � _ <br /> and 6 inches of topsoil will be addedlreplaced prior to final stabiv.zation. <br /> Concrete Washout:Location of concreta washou# <br /> �Off site _Indicated on site plans ^Qther(desczigtion): �Contained on tr�tck: <br /> Vegetation:Protsctive fencing will be instelled as necessary so as to excIude all fi11 and equipment <br /> from the drip line or critical root wna,whichevgr is grea.ter,of all vegetatio�to ba retained. <br /> �Xes ^Not Applicable Otlzer(description): <br /> T.nspeetions: An erosion control insgection pIan is raquared for all projects disturbing 1/acre or <br /> greater. The inspection requirements are as follows: <br /> 1) The individual identified as being responrible for fmplementing the erosion control <br /> plan must routinely inspeci the corrstrudion site once every severr days dro�ing active <br /> construction and within 24 hours a,}ter a ram}'a11 event greater than 0.5 inche,s in 24 <br /> horas. <br /> 2J All�ispections mrd maintenance co�duded d�ng consiruction mvst be recorded in <br /> writing mid these records»sust be retairred with the erosipn aontrol plcm mad mude <br /> available at the Distrid's reque.rt withTrt 24 ho�s.Records of each�inspection me�► <br /> nsamtenance activity shall include: <br /> � Date and time of inspections; <br /> ii. Name ofpersori conduc�tirig inspedions; <br /> iii. Fbrdfrigs of tnspections, including recornmendations for carredive actions; <br /> iv. Corrective actlons taken(including da7es, times andparty completing <br /> mcr�tltenance actfvitses),•and <br /> x Date cmd rrmount of all rainfall evenLs greoter thon 0.5 inches in 24 hours. <br /> Provide the foltowing information for the primary indivi.dual respons bl'e for implementing the erosion <br /> control plan: � <br /> Name W 1 f.�f..1�1� � '��/ <br /> Organization <br /> __ Phone �o/Z.��� Z'S'� Alternate Phone �• �ZZ� C5�.3 Z <br /> Emaal !_3/C4C��/G�- /✓/Jl�---+�l�'��'`�i�J C'-C?�� <br /> I cet-fify.that I am familiar with the reqniremenfs af the MCWD Erosion Coatrol Rule and that the <br /> prnposed activiiy will be conducted in compliance with this rale. <br /> .���'.✓1����' _ Zi.�vc� Zo%5� <br /> Sign�.tvre of Applicant or Auihorized Agent Da� <br /> ��C�IVED <br /> AUE��r�:� 2015 � �,, ,,, � <br />
The URL can be used to link to this page
Your browser does not support the video tag.