My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-17-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
08-17-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:59:36 PM
Creation date
1/12/2016 1:58:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{11) Placement of naturai rock riprap, including associated grading of the shoreiine and placement of <br /> a fllter blanket, is permitted if the finished slope does not exceed three feet horizontal to one foot <br /> vertical, the landward extent of the riprap is within ten feet of the ordinary high water level, and <br /> the height of the riprap abave the ordinaty high water level does not exceed three feet A riprap <br /> permit shall be obtained per the requirements of section 7&969. <br /> {� Excavations where the intended purpose is connection to a public water, such as boat slips, canals, <br /> lagoons and harbors, are prohibited above the ordinary high water levef. Such excavations below the <br /> elevation or the ordinary high water level are subject ta approval of the department of natural resources <br /> and other agencies with concurrent jurisdiction. <br /> (Ord. No. 101 2nd series, § 1(10.56(16)(�),2-24-1992; Ord.No. 127 2nd series, § 8, 7-11-1994; <br /> Ord.No. 163 2nd series, § 3, 12-8-1997; Ord.No. 171 2nd series, § 2,4-4-1998; Ord.No. 28 3rd <br /> series, § 17, 8-22-2005; Ord. No. 133 3rd series, §§ 2, 3, 1-2b-2015) <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.