Laserfiche WebLink
r <br /> ���� Memor <br /> andum <br /> �„r°�x�p�nrn�nta� <br /> Nr.3� s�or�,��. R:,K�F.�,WI�+o� <br /> 71 S-3�T�STT ���eP��y�eo.coa <br /> To: Jon Norris <br /> Mar1c Gronberg, Gronbeng Assoc. <br /> From: Kelly Bopray <br /> Subjec�: Orchard Park,W�tland Defineation Report <br /> Date: August 2, 2015 <br /> Attached please find one rApy each of the wetland delineation report along with the applicatron <br /> forrn for wetland delineation approval for your s�te in Orono Minnesota. I have sent Beth Brvwn <br /> at the Minnehaha Creeic Watershed District (MCV1fD) a copy of the report for hex review and an <br /> eiectronic copy to distribute to the other reviewing members of the Technicat Evaluafiorz Panel <br /> (T'EP). You wiU have#a sign th�application farm on the second page and get that to MCWD as <br /> soon as possible. The MCWD w�ebsite is not dear if there is a fee for this review or if that will <br /> come when you apply fior a MCWD permit. <br /> The Corps o#Engir�eers (CDE} also regufates wetlands. I have serrt a copy of the applica#ion <br /> form and report to the COE on your behalf. The COE contad is Melissa Jenny, US Army Corps <br /> of Enginaers, 180 Fifth Street East, Suite 700, St. Paul, MN 55101-1678. <br /> The WCDITEP may do a site visit fio rev+ew the cfelinea#ion. I would necommend that you have <br /> me present at that site vis�if they hold a T'EP meeting. They may requir�e the wetiand <br /> boundaries be restaked irom the original survey prior to doing an on�site r�view. <br /> You should be aware that both the City and MCWD require bufFer areas around w�etlands. The <br /> wic�th of the buffers may be different for City and the MCWD. If the MCWD does not have all af <br /> the wetlands in their irnrerrtory, they may require you to do a MnRAM analysis to dassify the <br /> wetlands and es#abfish the bufFer width. <br /> If you have any ques�ans please feei free to call me at 715-307-4577. <br />