My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
07-20-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2020 8:43:11 AM
Creation date
1/12/2016 1:34:15 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
wedand. No gradi.ng or filling in wetland basins should commence until a11 necessary permits <br /> have been obtained. Violation of wetland regulations may result in substantial civii and crimvial <br /> penalties. �.ocal ordinaaces may regulate wetland modifications such as brush and trce removal <br /> and buining in addition to grading and filling. Depending on the location of the property,buffers <br /> a�ound the wetland may also be protected. Any activities in the proaimity of the wetland should <br /> be cleared with appmpriate WCA regulatory agencies. It is also advisable to have the wetland <br /> boundary s�uveyed by a licensed land surveyor. Since thc pin flags used along the boundary can <br /> be vandalized or inadvertently lmocked over, a GPS survey of the flags will assure the <br /> permanence of the boundary. The client should also be aware that accordixig to current BWSR <br /> and COE wetland rules and regulations approved wetland boundaries are typically valid for five <br /> years fi-om the date of approval. <br /> To avoid p�ject delays associated with wetland regulations, it is essential that you acquire <br /> necessary permits fram aIl jurisdictional agencies before initiating activihes. A WCA <br /> Sequencing forni, a WCA and Army Coips of Engineers Replacement Plan Application form, <br /> and a DNR permit application are among the materials that you may be required to submit if <br /> impacts are proposed for the delineated wetlands. By initiating the peimit process as soon as <br /> possible,potential costly delays to the project may be avoided. <br /> Svoboda Ecological Resources 300&350 Stabbs Bsy Road <br /> Pmje�t Number:2014-037-03 '] Orono <br />
The URL can be used to link to this page
Your browser does not support the video tag.