My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
07-20-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2020 8:43:11 AM
Creation date
1/12/2016 1:34:15 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ' � <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,June 15,2015 <br /> 6:30 o'clock p.m. <br /> Landgraver stated given the amount of activity on Watertown Road, it would be difficult to monitor <br /> Watertown Road. Landgraver commented there are dump trucks going down Watertown Road every ]0 <br /> to 15 minutes as part of the construction,but that he would encourage inspection of the road and that Staff <br /> should take steps to make sure the routes are minimized. <br /> McGrann asked if there is a way to limit the time table of the project. <br /> Curtis stated due to the amount of material to be brought to the site,that would basically be the limit. <br /> Staff has suggested hauling timelines and recommended a limit be placed on the grading work on site. <br /> Staff anticipates having a preconstruction meeting with the applicant and their contractor so everyone is <br /> on the same page, but that she does not know what the right solution is far the length of the project. <br /> McGrann commented the neighborhood would likely want to see a concerted effort rather than have it <br /> drawn out. <br /> Thiesse stated it appears the applicant would like the same thing, and in his view 3,000 cubic yards could <br /> be brought into the site within two weeks. <br /> Leskinen asked if Commissioner Thiesse's primary concern is the amount of fill. <br /> Thiesse stated his majar concern is getting the trucks off the roads within a reasonable amount of time. <br /> Leskinen asked if he would like to see a hard date. <br /> Thiesse stated he would like the applicant to set a hard date. <br /> Anderson stated last November through April they pleaded with Staff to be able to bring in soil so the <br /> fields would be ready for planting this spring, but that they have no way of knowing when the green light <br /> will be given. Anderson stated once that green light is given, they would like to do the project as fast as <br /> possible. <br /> Thiesse asked if he has a place to obtain the fill from. <br /> Page 20 of 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.