My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
06-15-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 11:49:25 AM
Creation date
1/12/2016 11:47:11 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
612
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� . c�� *�3 <br /> Melanie Curtis �� ✓ �� � � <br /> From: Mar An [marksworking@gmail.com] <br /> Sent: Monday, June 15, 2015 12:15 PM <br /> To: Melanie Curtis <br /> Cc: Dale Gustafson; Patrick B. Steinhoff; Mark; Frank Svoboda <br /> Subject: Re: #15-3716- PC Agenda and Staff Report <br /> Attachments: Trapped water area.jpg; Trapped Water pic 2.png; June 2013 Flooded Field due to drain tile <br /> failure.jpg; 2013 Flooded Hay field due to drain tile failure.jpg; 2014 Flooded Field due to drain <br /> tile failure.jpg; Barn foundation collapsing 2.jpg; Barn foundation collapsing.jpg <br /> Melanie, <br /> Over the weekend I had a chance to review your documents pertaining to the meeting tonight. <br /> There is an error I want to address regarding the statements made by the Hedbergs'engineer. <br /> The standing water to the north of the pond Steve Harris built is due to rain water/snow melt accumulating for <br /> the last 9 months after the stop work order. This area had the eroded topsoil recovered and placed on the <br /> hill which created a shallow depression. I was not allowed to connect this area with the pond area where the <br /> drain tile would allow it to drain. <br /> Attached are pictures from last fall and a current picture that shows this clearly. The standing water will drain <br /> again when we are allowed to complete the project. <br /> I also attached pictures showing the reason for the work. The failure of the drain tile caused significant <br /> flooding and crop damage the first two years we owned the property. Also, I attached pictures showing the barn <br /> foundation collapsing due to the erosion. <br /> I will provide photos to all parties interested. <br /> Thank you, <br /> Mark <br /> Mark Anderson I Captain Drake, LLC <br /> 601 Carlson Parkway, Suite 400 <br /> Minnetonka, MN 55305 <br /> PH: 952-484-2545 c <br /> FX: 952-745-7521 <br /> mark@captdrake.com <br /> www.chemsolusa.com <br /> www.northcentralco.com <br /> www.captdrake.com <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.