My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2015 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2010-2019
>
2015
>
05/18/2015 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 10:27:45 AM
Creation date
1/12/2016 10:27:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Twi � <br /> MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,May 18,2015 <br /> 6:30 o'clock p.m. <br /> houses on. In general the site is surrounded by single-family residentiaL There is a large wetland to the <br /> east. The applicant's residence accesses from Stubbs Bay Road under a shared driveway system. <br /> Staff's memo outlines each of the individual lots. Lot 1 consists of 2.25 dry acres and a portion of a small <br /> open pond at the extreme northeast corner. The lot contains an area of 20 percent slopes with more <br /> gradual slopes further east. The lot width is 196 feet at the 50-foot setback,just short of the 200-foot <br /> width requirement. <br /> Lot 2 contains 0.26 acres of wetland, the larger being along its north boundary, and a portion of a small <br /> open pond at the extreme southeast corner. The lot has a dry buildable area of 2.02 acres. The required <br /> 35-foot wetland setback to structures will likely force the building to be in the south half of the lot. <br /> Lot 3 as proposed has 2.00 acres of dry buildable plus a 0.16 acre portion of wetland at the very east end. <br /> Slopes appear to be in the 5-10 percent range. This lot meets the 200-foot width requirement and there <br /> should be no problem meeting all required setbacks. <br /> Lot 4 is proposed to have 2.00 acres dry buildable plus 13 acres of wetland in the northeast portion. The <br /> lot abuts the proposed cul-de-sac with a width of about 60 feet at the front lot line, 150 feet at the 50-foot <br /> setback, and 207 feet at the proposed line of the house site. It appears building setbacks can reasonably <br /> be met with a home on this property. <br /> Gaffron stated based on sketches on file and air photo review, it appears the existing septic system drain <br /> field may be bisected by the proposed lot line with Lot 4. It would appear, without the benefit of <br /> additional data, that issues with primary and alternate septic sites could be a problem for this lot. <br /> Lot 5 contains the existing residences addressed as 350 Stubbs Bay Road and has its driveway access to <br /> Stubbs Bay Road. Whether this residence will abandon the existing driveway and access from the new <br /> private road is a point for discussion; although,there may not be a strong argument either way. Lot 5 also <br /> contains a wetland to the north and east plus a small pond to the northwest. Dry buildable area is shown <br /> as 2.68 acres with 3.8 additional acres in wetland and pond. <br /> Lot 6 is shaped as a nearly equilateral triangle abutting the cul-de-sac at the southeast corner and abutting <br /> wetland along its northwest border. With a dry buildable area of 2.00 acres and 0.66 acres of wetland, the <br /> shape of the site,the low topography, and the wetlands will potentially make it difficult to locate a house <br /> and septic systems. <br /> Lot 7 has exactly 2.00 acres of dry buildable but a 0.56 acre finger of wetland extending through the lot <br /> from the northwest is likely to make it difficult to locate a house and two septic sites. The westerly two- <br /> thirds of the site is wooded while the east one-third is open. <br /> Gaffron pointed out the parcel that is not intended to be developed at this time. The portion of the <br /> property not being subdivided to create building sites should be platted as an outlot unless the applicant <br /> intends to make it a building site. If platted as an outlot, it will not be buildable until or unless it is related <br /> as a lot. If platted as a lot, it will be subject to septic testing as well as the stormwater and drainage trunk <br /> fee and park dedication fee. <br /> While the property abuts Stubbs Bay Road North,the proposed building sites are more than 300 feet from <br /> that road and proposed to be accessed via an extension of Kintyre Lane. The City's standard for <br /> Page 29 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.