Laserfiche WebLink
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,May 18,2015 <br /> 6:30 o'clock p.m. <br /> Gaffron stated about the only thing the Planning Commission can do at this point is to include a statement <br /> in the final plat saying that this is the recommendation for that piece of land. <br /> Landgraver stated the other part is who is going to be responsible for that outlot now and into the future <br /> and what they will be allowed to do with it. Landgraver stated the Planning Commission would like to <br /> see some firm language on that and whether it is going to be in a conservation easement or land trust. <br /> Leskinen stated a conservation district is with the City and a land trust is with the state. <br /> Gaffron stated given the history of the parcel and the recent discussions, he does not believe the applicant <br /> would be willing to give an easement of any type over the outlots at this point. <br /> Stickney stated he cannot at this point. <br /> Leskinen noted it was presented in the beginning as a land trust but that she is more concerned with <br /> protecting the woods. Leskinen noted a motion was made to table the application. <br /> Lemke seconded the motion. VOTE: Ayes 5,Nays 0. <br /> (Recess taken from 9:12 p.m. to 9:17 p.m.) <br /> 5. #15-3731 RENEE WIXON,4505 WEST BRANCH ROAD, SKETCH PLAN REVIEW, <br /> 9:17 P.M.—9:35 P.M. <br /> William and Renee Wixon, Applicants, were present. <br /> Gaffron stated this is a sketch plan to create a second 2-acre lot from a parcel that contains 4.71 dry acres, <br /> of which 3.90 acres is contiguous and 0.81 acres is separated by a creek and wetland that traverses the <br /> property from west to east. The property is located in the RR-1B District, which allows for single-family <br /> residential use with a minimum lot size of 2.0 acres and 200 feet lot width. <br /> The property does not appear to meet the minimum standards for subdivision. City Code requires two <br /> acres of dry buildable contiguous acreage in each lot. The property abuts a creek that enters the site at the <br /> northwest corner of the property, winds its way through the southerly portion of the site, and then exits to <br /> the east where it enters Forest Lake Bay of Lake Minnetonka. <br /> In addition,there is a delineated wetland that extends outside the defined drainage easement. At the point <br /> where the creek separates the dry buildable land at the southeast corner of the site,the wetland is <br /> approximately 50 feet in width. It would be inconsistent with past City practice to allow credit towards <br /> the 2-acre contiguous dry buildable requirement for two areas of land separated by a 50-foot wetland <br /> corridor. <br /> Gaffron stated under a standard subdivision process, each proposed lot must contain a minimum of 2.0 <br /> acres of contiguous dry buildable land. This requirement has to do with septic systems and the City has <br /> typically not granted variances to the noncontiguous land. <br /> The applicants have provided two conceptual lot layouts for consideration. Neither layout meets the <br /> requirement for both lots containing 2.0 acres of contiguous dry-buildable land. In each layout,the <br /> proposed new easterly lot contains less than 2.0 acres north of the creek/wetland that traverses the <br /> Page 25 of 37 <br />