My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-18-2015 Planning Commission Packet
Orono
>
Planning Commission
>
2015
>
05-18-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 10:24:05 AM
Creation date
1/12/2016 10:23:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. � <br /> FILE#15-3738 ` <br /> 14 May 2015 <br /> Page 2 of 5 <br /> Background <br /> The subjeci property is located on the north shore of Long Lake which is a recreational <br /> development lake for setback purposes;the home was built in appraximately 1977, prior to the <br /> adoption of the Shoreland Rules. Properties served by City sewer have a required 75-foot <br /> setback requirement from the OWHL(944.3'); a property served by a private septic system must <br /> meet a 100-foot structural setback. This property is currently served by a private septic system. <br /> The current owners purchased the property in 2014 with plans to make some changes: 1)An <br /> addition to the east portion of the home;2)Structural modifications to an existing portion of <br /> the west side of the home;and 3)An in-ground pool on the lake side of the horne requiring the <br /> follawing variances: <br /> Project Variances Needed Code Sections <br /> East 14'x 23'Addition Average Lakeshore Setback 78-1279 <br /> 100-foot Lake Setback <br /> West Addition Average Lakeshore Setback 78-1279 <br /> Pool Average Lake Setback 78-1279 <br /> 100-foot Lake Setback <br /> Hardcover w/in 75 feet of OHWL 78-1680 <br /> The average lakeshore setback line runs through approximately the center of the home;all <br /> three of the projects are proposed to encroach partial�y or wholly ahead of the average <br /> lakeshore setback line. The addition to the eastern portion of the home is proposed to be set <br /> back 84 feet from the OHWL,therefore lakeward of the 100-foot setback;the <br /> addition/modifications to the western portion of the home are ahead of the average lakeshore <br /> setbatk line, however will meet the 100-foot setback;and the in-ground pool is proposed to be <br /> 60 feet from the OWHL and therefore lakeward of both the 100-foot and average lakeshore <br /> setbacks, <br /> LOT ANALYSIS WORSHEET <br /> Lot Area/Width: <br /> LR-1A Lot Area Lot Width <br /> Required 87,120 s.f. (2 acres) 200' <br /> Actual 258,818 s.f. (5.94 acres) f680' C�OHWL&t700'@ 100'SB <br /> Setbacks: <br /> LR-lA RequPred Proposed <br /> Rear 50' No Change ±id4' <br /> East Side 30' No Change f280' <br /> West Side 30' No Substantial change±280' <br /> East Addition =84' <br /> Lakeshore 100' (non-sewered lot) West Addition = 103' <br /> Paol = 60' <br /> All proposed projects wilf be located lakeward of the average <br /> lakeshore setback line as follows: <br /> Average Lakeshore East Addition= 38' ahead <br /> West Addition= 15' ahead <br /> Pool= 65' ahead <br />
The URL can be used to link to this page
Your browser does not support the video tag.