Laserfiche WebLink
wetland. No grading or filling in wetiand basuis should commence until all necessary permits <br /> have been abtained. Violation of wetland regulations may result iun substantial civil and criminal <br /> pena.lries. Local ordi.nances may regulate wetland modifications such as brush and tree removal <br /> and buming in addition to grading and filliz�g. Depending on the location of the property,buffers <br /> around the wetland may also be protec#ed. Any activities in the proximity of the wetland should <br /> be cleared with appmpriate WCA regulatory agencies. It is atso advisable to have the wetland <br /> boundary surveyed by a licensed land surveyor. Since the pin IIags used along the boundary can <br /> be vandaiized or ivadvertently knocked over, a GPS survey of the flags wi11 assure the <br /> permanence of the boundary. The client should aiso be aware that according to current BWSR <br /> and COE wetland ruJ.es and regulations approved wetland boundaries are typically valid for five <br /> years from the date of approval. <br /> To avoid project delays associated with wetland regulations, it is essentiai that you acquue <br /> necessary permits from all jurisdictional agencies before initiating activities. A WCA <br /> Sequencing form, a WCA and Army Corps of Engineers Replacement Plan Application form, <br /> and a D�TR pemut application are among the naaterials that you may be required to submit if <br /> impacts are proposed for the delineated wetlands. By initiating the permit process as soon as <br /> possible,potential costly delays to the project may be avoided. <br /> Svoboda Ecological Resources 300&350 Stubbs Bay Road <br /> Project Numb�:2014-037-03 � Orono <br />