Laserfiche WebLink
15-3734 � ' <br /> May 14,2015 <br /> Page 4 of 5 <br /> there are a number of private roads in the City extending well beyond 1 UUU feet, it has been City <br /> policy to establish corridors for possible future development of "through roads" where that <br /> ability exists. A question fot discussion is whet�ier a corridor should be dedicated from the <br /> proposed road, extending west to Stubbs Bay Road <br /> Additionally, it is noteworthy that the applicant, staff and City Attorney are working with the <br /> developer of Kintyre to establish easement rights and responsibilities for the extension of Kintyre <br /> Lane to serve this proposed development. <br /> The sketch plan shows a proposed road corridor width of 50 feet which meets code. The standard <br /> minimum paved width for a road serving more than 7 units would be 28', and this would be a <br /> rural section (shoulders and ditches} except where curbing is necessary to manage stormwater. <br /> The minimum paved diameter for a cul-de-sac i.s 8Q feet. Street design and grading infozmation <br /> is required at the time of preliminary plat for City Engineer and Fire Marshal review. <br /> Road Improvements andJor Easements Needed <br /> The City will require a Road, Drainage and Utilities Easement over the private road, which <br /> should be platted as an outlot and designed and built to City private mad standards. Standard <br /> perimeter drainage and utility easements will be required along all property boundaries in the <br /> plat as well as Conservation and Flowage Easements over any delineated wetlands and <br /> drainageways. <br /> Park/Trail Easement/Fees or Dedication Needed <br /> The CMP indicates tb.a.t a future trail is proposed along Stubbs Bay Road, connecting form a <br /> conceptual trail along the south side of the Burlingtan Northern railroad corridor down to the <br /> shore of Stubbs Bay. Whethex ttus trail will ever be completed is unknown; a 10' easement <br /> along the west boundary for future trail purposes should be explored. Additionally, as 6 new <br /> building sites are being proposed, payment of the standard Park Dedication fee for 6 new <br /> building lots would be appropriate; the current fee is $5,550 per lot or a total of$33,300. The <br /> subdivision proposai should be reviewed by the Pazk Commission once a preliminary plat <br /> application is filed. <br /> Stormwater and Drainage Improvements & F'ees <br /> Creation of a new private road is likely to require stormwater ponding and/or other stormwater <br /> management measures. Given the general slope to the northeast, it is likely that ponding would <br /> occur in the area of one of the 4 proposed northerly lots. Ponding areas will require the <br /> establishment of easements and the ponding areas will not be creditable as dry buildable area. <br /> The property will be subject to the Stormwater and Drainage Trunk Fee. Anticipated final <br /> Council action on revisions to the Trunk Fee would result in a fee of 6 lots @ $768Q/lot = <br /> $46,080. <br /> Utility Locations and Availability <br /> The properties would be served by private on-site septic systems and private welis. Full soil <br /> testing and system design will be required for each new Iot. <br /> Wetlands on Site and/or Impacted <br />