Laserfiche WebLink
The $25,000 fire system upgrade for 2016 will be moved to 2018. Bad pipes indicate the air <br />compressor is not functioning efficiently. <br />Edwards noted that next year the salt shed roof needs replacement. He will bring an <br />inspector in to inspect the roofs before investing money into the building. Walsh stated the <br />roof inspection should be done annually as preventative action. Walsh inquired about the <br />City Hall roof. Edwards said when the City Hall roof was originally done the metal joints <br />were not good. The repair needs to happen because the soffits are rotting due to water <br />damage. <br />Edwards said in 2016 $7,800 has been budgeted for the Orono Golf Course kitchen <br />rehabilitation. The plan is to install a stainless steel counter top and sink along with shelves. <br />In house labor, with the exception of the floor, will keep costs in budget. It was noted that in <br />2016 $15,000 should be added for irrigation. <br />Olson said the Fire Long Lake CIP fund has $440,000 to consider replacement of a rescue <br />pump truck and $50,000 for carpet replacement at Station 1. Council Member Cornick <br />thought $50,000 for carpet and paint was high for one building and then there is another <br />request for $30,000 in 2017 for carpet and paint for Station 2. Did Fire Chief Eyll go out for <br />bids on the project? Loftus relayed that Fire Station II is fully owned by the City of Orono <br />and that Station I is only 50% Orono owned. Perhaps that is how the carpet/paint <br />maintenance could be addressed. <br />Loftus said that the Fire Department has formed a committee to research the purchase of the <br />new truck. Walsh wants detail on purchasing equipment rather than have a committee do the <br />research since it is City funds. <br />Olson relayed that the Community Investment Fund would be in the red once the <br />Navarre Park and Ride, County Road 112 Turn Back Project, and the Navarre Trail <br />improvements are completed. McMillan would like a placeholder for funds to address the <br />intersection improvements of CSAR 15/19 for year 2020. This can be moved to the year <br />when it realistically happens. Hennepin County and Three Rivers Park District (TRPD) will <br />address Council in January regarding the grant funding. The funding would assist with <br />stormwater improvements if we agree to TRPD involvement <br />Edwards reviewed the 10 year CIP wish list for road repair and reconstruction. <br />Unfortunately there are no funds available for this Public Works pian. <br />McMillan, Printup and Walsh would like a plan that names the ten worst roads and when it is <br />eminent to repair. The plan should go out 10 years but realistically we do not have the <br />funding to provide that repair work. <br />Printup would like to see a 5 year plan with discussion at a work session in February. <br />November 23, 2015, Council Work Session Meeting Minutes <br />