Laserfiche WebLink
ES <br />CITY OF OROt%,10 <br />RESOLUTION OF THE CITY COUNCIL <br />NO. <br />6 <br />(f) The contractor shall inform all employees, delivery trucks and subcontractors that <br />if they fail to abide by these restrictions they will not be allowed to work on the project; <br />(g) An email address and phone number for the contractor shall be given to the <br />neighbors so they can easily inform the contractor at any time if there are concerns that <br />need to be addressed. <br />(h) The City will assist with monitoring traffic during the hours that school buses are <br />expected to be present if the City receives reports of repeated problems during the <br />restricted hours as defined in item 8c above. If it is determined by the City that a CSO or <br />Officer needs to be present during the morning Heritage Lane school bus schedule times, <br />the City may arrange for a CSO or Officer to be present at those specific times, and the <br />Developer shall be billed the actual costs thereof at a cost of $50 per hour. School bus <br />pickup/dropofftimes as provided by the Orono School District are as follows: <br />AM — Secondary: 7:00 — 7:20 Elementary: 8:20 - 8:40 <br />PM — Secondary: 2:55 - 3:15 Elementary: 4:05 - 4:25 <br />(i) If the majority of homeowners on Heritage Lane submit a written request, and <br />only after a public hearing and upon approval by the City Council, the City will install <br />temporary speed bumps within Heritage Lane. This provision shall apply only during <br />road and home construction and shall not be permanent. <br />0) Developer shall :install signage within the right-of-way of Heritage Lane at a <br />location to be approved by the Public Works Director indicating that all construction <br />traffic shall make right turns only onto Shoreline Drive when exiting Heritage Lane. <br />The above conditions shall be included in the sale documents for each lot, and shall be <br />enforced by the Developer and Owner. <br />9. Development Fees <br />A. Park Dedication Fee. The development is subject to the standard Park Dedication <br />Fee requirement. Because the value of each newly created lot will be in excess of <br />the threshold value of $69,375.00 the 8% park fee cap of $5,550 per lot will <br />apply. Park dedication fee will be 3 lots x $5,550 = $16,650. <br />B. Storm Water and Drainage Trunk Fee. The development is subject to the standard <br />Storm Water and Drainage Trunk Fee of $7,680 per new lot x 3 new lots = <br />$23,040. <br />C. Sewer Connection Charge. The development is subject to a Sewer Connection <br />Charge based on the 2015 Orono Fee Schedule for the 1998 Shoreline/Heritage <br />Sewer Project at the rate of $22,440 per lot x 4 lots = $89,760. <br />Final 12/15/15 (V7) MPG <br />Page 9 of 12 <br />