Laserfiche WebLink
RESOLU�IITION OF THE CITY COUNCIL <br />NO. 6569 <br />Tree Preservation Areas along the perimeter of the site and including the <br />defined bluff areas, will be established, such areas to be subject to covenants <br />for tree protection. The trees existing on the subject parcel range from poor to <br />good health. The majority appear to be in good health. Dead trees will be <br />removed from the lots if they are within grading areas or if they pose a safety <br />hazard. Other protective measures include the review of any home building <br />plans by an architectural review committee in order to minimize tree loss. <br />Perimeter areas around the wetlands are protected by MCWD required <br />wetland buffers. <br />There will be 110 trees removed for the construction of the extension of <br />Heritage Lane and the new cul de sac. <br />Within individual lots, tree clearing will be avoided to the extent possible, but <br />due to the lots being located within the maple basswood forest, a certain <br />amount of tree clearing will be unavoidable. Building pad footprints have <br />been selected to take advantage of natural clearings and existing flat grades <br />whenever possible. When clearing is required, removal will first focus on <br />undesirable tree species. Any significant trees that are removed will be <br />replaced at the required ratio and all work will abide by any Orono city code <br />regarding tree replacement. <br />Due to the proposed house locations within the maple basswood forest, all <br />positive views will remain, with the residences protected from view by the <br />large trees. The rolling hills onsite will further assist with the protection from <br />negative views. <br />15. The property is within the Metropolitan Urban Service Area (MUSA). The <br />Developer has proposed to serve each of Lots 1, 2 and 3 with municipal sewer via <br />the existing municipal pressure sewer force main located within Heritage Lane. <br />The Property was not assessed for construction of the 1998 Shoreline/Heritage <br />sewer project and will be subject to the appropriate connection charge per the <br />Orono Fee Schedule. An engineering design for the new sewer connection will be <br />required prior to final plat approval. The anticipated design will include an <br />extension of the municipal forcemain to the new cul-de-sac, with each of the three <br />new homes having an individual grinder pump discharging to the force main. <br />16. The proposed site grading plan includes creation of individual house building <br />pads as part of the subdivision improvements for Lots 1 and 2. The "existing <br />grades" for measuring building heights and number of stories will be the proposed <br />grades as shown on the grading plan. <br />Find 12/15/15 (V7) MPG <br />Page 6 of 12 <br />