My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-14-2015 Councill Packet
Orono
>
City Council
>
2015
>
12-14-2015 Councill Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2015 10:02:41 AM
Creation date
12/23/2015 9:37:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1094
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Sewer <br />In recent years the sewer fund has mostly operated at a loss. Non-operating revenues however, <br />have consistently offset the operating losses. This has resulted in a positive operating cash flow <br />for the fund. In 2016, the fund is projected to cover operating expenses, including depreciation. <br /> <br />The 2016 budget includes depreciation of $275,000 which is a non-cash expenditure. The fund is <br />budgeted to show a positive operating cash flow for the year. In 2015 the budget had a $90,000 <br />increase in charges to the MCES. For 2016, the line item is decreasing by $92,780. Overall, <br />operating expenditures for the sewer fund are decreasing $66,855 (-5.01%). The revenues are <br />calculated with a 4% increase in the sewer rates as called for in the 2013 rate study. The <br />operating transfer is to cover the sewer improvement that were part of the Casco Point project <br />and will continue for another six years. <br /> <br />Upcoming capital expenditures can be covered by the fund’s current cash balances. Projects <br />identified in the CIP for 2016 include: sewer line rehabilitation; sewer televising; lift station <br />updates for GS #6; a generator for lift station #5; the expansion of the northern collection system; <br />lift station monitoring; and a new roof for the Navarre Garage. Total anticipated capital <br />expenditures are $1,217,608. The current cash balance for the fund is $2,728,820. The costs <br />associated with the northern system expansion will eventually be recovered from developers. <br /> <br /> <br />Stormwater <br />The Stormwater Fund is for the most part project based. Operating expenditures are mainly <br />limited to engineering associated with NPDES, SWPPP and other state and federal requirements. <br />Public Works time and materials spent on culvert cleaning/replacement are also charged to this <br />fund. The purpose of this fund is to collect money for the larger Stormwater projects that will be <br />required in the future. The revenue in the attached budget is calculated with a 5% increase in <br />the rates. Potential CIP projects in 2016 include: Watershed Delineation; Watertown Road phase <br />II, replacement of the street sweeper, replacement of the tractor mount broom, Long Lake <br />Wetland Restoration, Replacing the Truck Mounted Sweeper, and Kelley Avenue drainage <br />improvements. The capital expenditures total $368,700. The funds current cash balance is <br />$1,466,706. <br /> <br />Recycling <br />The recycling fund was newly created in 2013. Its major expenditure line is for contracted <br />recycling charges. The current contract with Waste Management is capped at a 2.8% increase. <br />However, as the result of low prices for recycling materials, the Recycled Material Offset (RMO) <br />credit that we receive has been reduced to $0. The lack of the RMO has required larger rate <br />increases than originally anticipated. The full time wages that are charged to the fund represent <br />10% of the City Clerks wages. The overtime covers Public Works wages for the annual spring <br />clean up. The funds current cash balance is $0. <br /> <br />Cable <br />The Cable fund was new for the 2014 budget. The 2016 projected revenues are based on current <br />subscriber information and rates. The line item for Internet/Other communications covers the
The URL can be used to link to this page
Your browser does not support the video tag.