Laserfiche WebLink
<br />2016 Fee Schedule-Page 11 <br /> <br />CONSTRUCTION PERMITS AND INSPECTION FEES (CONT.) <br />Applicable <br />Permit Type Fee Code Section <br /> <br />MUNICIPAL CONNECTION PERMIT (together with area connection charges) <br />Sewer $ 50.00 <br />SAC (Sewer Availability Charge)-Determined by MCES $2,485.00 <br />Water $ 50.00 <br />Water Meter & Horn Fees <br />5/8" (3/4"x7-1/2") meter with horn including sales tax (Expected to increase 10%) $ 314.67 or current cost Res. #5101 <br />3/4" (3/4"x9") meter with horn including sales tax (Expected to increase 10%) $ 390.34 or current cost <br />1" meter with horn including sales tax (Expected to increase 10%) $ 497.37 or current cost <br />Larger meter Quote Basis <br /> Horn including sales tax Quote Basis <br />Mail-in postage & handling charge $ 2.00 <br /> (sewer and water permits only)