My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-14-2015 Councill Packet
Orono
>
City Council
>
2015
>
12-14-2015 Councill Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2015 10:02:41 AM
Creation date
12/23/2015 9:37:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1094
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br /> <br /> DATE: December 14, 2015 <br /> ITEM NO: 5 <br /> <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Diane Tiegs JML Public Hearing <br />Title City Clerk <br /> <br />Item Description: Proposed 2016 Fee Schedule <br /> <br />Attachment: A. Proposed 2016 Fee Schedule Ordinance <br />B. Summary Ordinance <br /> <br /> <br />The City updates its fee schedule annually. As part of this process the Council has chosen to hold <br />a public hearing to discuss proposed changes in the Fee Schedule for 2016. Fees for water, sewer, <br />and storm water have been set based on a rate study completed in 2008 by the City’s financial <br />advisors. <br /> <br /> <br />Proposed Utility Rate Changes <br />• Page 26 – Municipal Sewer Rates. A 4% increase for the Utility Service Rates is <br />recommended effective the 1st Quarter of 2016. The increases are necessary to cover system <br />maintenance. <br />• Page 26 – Municipal Water Rates. An 11% increase for the Municipal Water Rates to <br />cover infrastructure needs. <br />• Page 28 – Recycling Rates. R ecycling fees are recommended to increase by 10% to <br />accommodate the reduced revenue from recycled materials. <br />• Page 28– Storm Water Rate. Storm Water fees are recommended to increase by 5% to <br />accommodate maintenance needs. <br /> <br /> <br />Other Proposed Fee Schedule Changes <br />• Page 2 – Commercial Site Plan Review. A new Application Escrow for minor <br />modification of existing building per Sec. 78-42 of $2,500 minimum. <br />• Page 6 – The Storm Water and Drainage Trunk Fees. An increase of 5%. <br />• Page 8 – Building Permit. These fees are based on Total Valuation and the Valuation <br />Table will be included in the Fee Schedule. <br />• Page 11– Municipal Connection Fees. Increase to Water Meter and Meter Horns of 10% and <br />will charge the current cost. <br />• Page 12 – Connection to Sewer System in Adjacent City. A fee verbiage addition to include <br />“whichever is higher”. <br />• Page 15 – Sewer Projects. The 2010 Sewer connection at North Farm Road Staff has an <br />increase of 5.25% which is the interest rate of the outstanding special assessments. <br />• Page 16 – 2009 Utility Projects at Myrtlewood Utility Improvements increased the project <br />6.25% which is the interest rate of the outstanding special assessments. <br />• Page 18 – Signs. A Permanent Sign permit fee of $50.00.
The URL can be used to link to this page
Your browser does not support the video tag.