My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3444
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 3400 - 3499 (March 14, 1994 - November 28, 1994)
>
Resolution 3444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2015 12:20:27 PM
Creation date
11/19/2015 12:20:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y � <br /> � �� <br /> O .. O CITY of ORONO <br /> � � -�'����=� RESOLUTION OF THE CITY COUNCIL <br /> � ��� ���;� ti <br /> � y� No. �4� 4 <br /> ,� ;, Gti <br /> �9'�'E3i;�g'� <br /> 4. Dedication of drainage and utility easements 5' along all interior lot lines and 10' <br /> along the perimeter boundaries and adjacent to road right-of-ways. <br /> 5. Prior to any site improvements within the second phase, erosion control as shown <br /> on preliminary grading and drainage plans must be installed and maintained until <br /> natural groundcover is restored. <br /> 6. Prior to site grading improvements, all tested septic sites on both the Coffin and <br /> Dickey parcels must be fenced off (exception Lots 16 and 17, Coffin parcel). <br /> 7. All wetlands designated on City conservation maps shall be shown as drainage <br /> easements on the plat. Designated wetland within Lot 16 must be designated by <br /> a drainage easement. <br /> 8. Drainage easements shall be taken over all retention ponding areas and drainage <br /> • ways as in the first phase review, such easements shall be recorded in the chain <br /> of title and developer shall create covenants to define future home owners <br /> association's responsibility for the upkeep and maintenance of all drainage <br /> facilities. <br /> 9. Payment of a park dedication fee prior to final plat approval. The City will <br /> require no park or trail dedications with the second phase platting of this <br /> property. <br /> 10. The following lots have been found to contain protected wetlands not designated <br /> on the City's conservation area maps: <br /> Dickey Parcel: <br /> Lots 8, 17, 18 and 19, Block 2. <br /> Coffin Parcel: <br /> Lots 11, 12, 13, 15, 17 and 20, Block 1. <br /> i <br /> The following lots have involvement with mitigation areas: <br /> Dickey Parcel: � <br /> Lots 8, 9, 13, 16, 17, 18 and 19, Block 2. <br /> • Page 4 of 7 <br /> r«m soos a�ao�o <br />
The URL can be used to link to this page
Your browser does not support the video tag.