Laserfiche WebLink
(r � � <br /> . ��4 , . <br /> � <br /> � ��' CITY of ORONO <br /> O .:� �� T O �. <br /> • . �� � ,� RESOLUTION OF THE CITY COUNCIL <br /> ,� ��'" ' , �„ � 4 2. °� <br /> �, � ., ��� ti No. . <br /> ti, ti <br /> '��`9�' Og'�G <br /> EsH� <br /> d. Bike trail and interior pedestrian trail (located only within Dickey parcel). <br /> e. Removal of all structures within Outlot A. � <br /> f. Removal of all accessory structures on Lot 1, Block 1 that do not conform <br /> to required setbacks from newly defined lot lines. <br /> g. Cleaning/upgrading of existing ditch that runs along the Luce Line <br /> adjacent to Coffin property. <br /> h. Replacing existing 18" culvert (to the west of the intersection of Luce <br /> Line and Old Crystal Bay Road) which is in disrepair with a 12" opening <br /> at inlet. Install a second higher culvert through Luce Line to act as an <br /> overflow or lower elevation of the Luce Line at this location providing <br /> applicant's plans meet the requirement that slope is no greater than 1%. <br /> • i. Installing a new culvert under the horse trail in the area by the pond south <br /> of the Coffin property. <br /> The subdivider has posted a Letter of Credit in the amount of $308,122.50 to <br /> ensure that these required improvements are completed to City's satisfaction. <br /> 12. Payment to the City of a park dedication fee in the amount of $25,468.00. <br /> 13. Payment to the City for the legal review and filing of the plat, easements and <br /> covenants in the amount of $200.00. <br /> NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Orono <br /> hereby approves the plat of Old Crystal Bay Road Addition, Hennepin County, Minnesota, <br /> subject to the following conditions: <br /> 1. The subdivider shall fence off the following drainfield sites prior to construction <br /> of roadway and drainage improvements and this fencing shall be maintained in <br /> place until lots are developed; Lots 1-6, Block 2, Lots 3-7, Block 3, Lots 1-10, <br /> Block 4. � <br /> 2. Erosion control shall be installed as shown on preliminary grading and drainage <br /> • plans and maintained until natural groundcover is restored. <br /> � Page 3 of 4 <br /> . � FamS005DiskOrono <br />