Laserfiche WebLink
w V <br />■J <br />k <br />SYSTEM DESIGN <br />FOR BRUCE COMPANIES <br />OF THE CHIP FISHER RESIDENCE <br />IN TRACT C, R.L.S. ltl35B <br />ORONO, MINNESOl’A <br />DECEMBER 11, 1989 <br />Information follows for the installation of a pressure mound <br />system. In addition to those requirements, two septic tanks of at <br />least 1,000 gallons each are needed along with a pumping tank of <br />at least 1250 gallons. <br />All construction and materials must adhere to the provisions <br />of the City of Orono. All grading and construction traffic must <br />be kept off both the primary and the alternate septic system <br />sites. Runoff water should be diverted from the mound area. <br />If any additional information is needed, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />Mark S. Gronberg <br />PCA certified <br />MSG/lh <br />(prcr) <br />'i <br />1 <br />i <br />1