My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LA22-000035 (2659 Casco Point Rd) Ex B Plans
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2659 Casco Point Road - 20-117-23-23-0022
>
Land Use
>
LA22-000035, VAR
>
CC 08082022
>
LA22-000035 (2659 Casco Point Rd) Ex B Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 1:20:32 PM
Creation date
6/2/2026 1:20:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DWEL <br />L <br />I <br />N <br />G <br />PROP <br />O <br />S <br />E <br />D <br />LEGAL DESCRIPTION: <br />Lot 137, Spring Park, Hennepin County, Minnesota. <br />SCOPE OF WORK & LIMITATIONS: <br />1.Showing the length and direction of boundary lines of the legal description listed above. <br />The scope of our services does not include determining what you own, which is a legal <br />matter. Please check the legal description with your records or consult with competent <br />legal counsel, if necessary, to make sure that it is correct and that any matters of record, <br />such as easements, that you wish to be included on the survey have been shown. <br />2.Showing the location of observed existing improvements we deem necessary for the <br />survey. <br />3.Setting survey markers or verifying existing survey markers to establish the corners of <br />the property. <br />4.Existing building dimensions and setbacks measured to outside of siding or stucco. <br />5.Showing and tabulating impervious surface coverage of the lot for your review and for <br />the review of such governmental agencies that may have jurisdiction over these <br />requirements to verify they are correctly shown before proceeding with construction. <br />6.Showing elevations on the site at selected locations to give some indication of the <br />topography of the site. We have also provided a benchmark for your use in determining <br />elevations for construction on this site. The elevations shown relate only to the <br />benchmark provided on this survey. Use that benchmark and check at least one other <br />feature shown on the survey when determining other elevations for use on this site or <br />before beginning construction. <br />7.This survey has been completed without the benefit of a current title commitment. There <br />may be existing easements or other encumbrances that would be revealed by a current <br />title commitment. Therefore, this survey does not purport to show any easements or <br />encumbrances other than the ones shown hereon. <br />8.It should be noted that this survey was completed with significant snow coverage on site. <br />We cannot be certain that all items were observed and located during the process of <br />conducting the survey due to the snow cover. If this uncertainty is something you would <br />like to remove, please expose all improvements and we can return to locate said items, if <br />needed. <br />STANDARD SYMBOLS & CONVENTIONS: <br />"●" Denotes iron survey marker, found, unless otherwise noted. <br />#43503 <br />LICENSE NO. <br />Wayne W. Preuhs <br />DATE <br />S1 <br />JUNE 15, 2022 <br />Minnetonka, Minnesota 55345 <br />Phone (952) 474-7964 <br />17917 Highway No. 7 <br />Web: www.advsur.com <br />Advance <br />Surveying & Engineering, Co. <br />ATRION FAIOLA <br />2659 CASCO POINT RD. <br />CLIENT/JOB ADDRESS <br />ORONO, MN <br />SHEET TITLE <br />PROPOSED SURVEY <br />SHEET NO. <br />SHEET 1 OF 1 <br />DWG ORIENTATION SCALE <br />220854 JR <br />DRAWING NUMBER <br />20'10'0 <br />DECEMBER 22, 2021 <br />DATE SURVEYED: <br />JUNE 15, 2022 <br />DATE DRAFTED: <br />SHEET SIZE: 17 X 22 <br />GRADING & EROSION CONTROL NOTES: <br />BEFORE DEMOLITION AND GRADING BEGIN <br />·Install silt fence/bio roll around the perimeter of the construction area. <br />·Sediment control measures must remain in place until final stabilization <br />has been established and then shall be removed. Sediment controls may <br />be removed to accommodate short term construction activity but must <br />be replaced before the next rain. <br />·A temporary rock construction entrance shall be established at each <br />access point to the site and a 6 inch layer of 1 to 2 inch rock extending <br />at least 50 feet from the street into the site and shall be underlain with <br />permeable geotextile fabric. The entrance shall be maintained during <br />construction by top dressing or washing to prevent tracking or flow of <br />sediments onto public streets, walks or alleys. Potential entrances that <br />are not so protected shall be closed by fencing to prevent unprotected <br />exit from the site. <br />·Contractor shall install inlet protection on all existing storm sewer inlets <br />in accordance with the city standard details. Inlet protection shall also <br />be provided on all proposed storm sewer inlets immediately following <br />construction of the inlet. Inlet protection must be installed in a manner <br />that will not impound water for extended periods of time or in a manner <br />that presents a hazard to vehicular or pedestrian traffic. <br />DURING CONSTRUCTION: <br />·When dirt stockpiles have been created, a double row of silt fence shall <br />be placed to prevent escape of sediment laden runoff and if the piles or <br />other disturbed areas are to remain in place for more than 14 days, they <br />shall be seeded with Minnesota Department of Transportation Seed <br />Mixture 22-111 at 100 lb/acre followed by covering with spray mulch. <br />·A dumpster shall be placed on the site for prompt disposal of <br />construction debris. These dumpsters shall be serviced regularly to <br />prevent overflowing and blowing onto adjacent properties. Disposal of <br />solid wastes from the site shall in accordance with Minnesota Pollution <br />Control Agency requirements. <br />·A separate container shall be placed for disposal of hazardous waste. <br />Hazardous wastes shall be disposed of in accordance with MPCA <br />requirements. <br />·Concrete truck washout shall be in the plastic lined ditch and dispose of <br />washings as solid waste. <br />·Sediment control devices shall be regularly inspected and after major <br />rainfall events and shall be cleaned and repaired as necessary to provide <br />downstream protection. <br />·Streets and other public ways shall be inspected daily and if litter or <br />soils has been deposited it shall promptly be removed. <br />·If necessary, vehicles, that have mud on their wheels, shall be cleaned <br />before exiting the site in the rock entrance areas <br />·Moisture shall be applied to disturbed areas to control dust as needed. <br />·Portable toilet facilities shall be placed on site for use by workers and <br />shall be properly maintained. <br />·If it becomes necessary to pump the excavation during construction, <br />pump discharge shall be into the stockpile areas so that the double silt <br />fence around these areas can filter the water before it leaves the site. <br />·Temporary erosion control shall be installed no later than 14 days after <br />the site is first disturbed and shall consist of broadcast seeding with <br />Minnesota Department of Transportation Seed Mixture 22-111 at 100 <br />lb/acre followed by covering with spray mulch. <br />·Erosion control measures shown on the erosion control plan are the <br />absolute minimum. The contractor shall install temporary earth dikes, <br />sediment traps or basins and additional silt fencing as deemed necessary <br />to control erosion. <br />SITE WORK COMPLETION: <br />·When final grading has been completed but before placement of seed or <br />sod an “as built” survey shall be done per City of Minnetonka <br />requirements to insure that grading was properly done. <br />·When any remedial grading has been completed, sod or seeding shall be <br />completed including any erosion control blankets for steep areas. <br />·When turf is established, silt fence and inlet protection and other erosion <br />control devices shall be disposed of and adjacent streets, alleys and <br />walks shall be cleaned as needed to deliver a site that is erosion resistant <br />and clean. <br />·Contractor shall maintain positive drainage of a minimum 2% slope <br />away from proposed building.
The URL can be used to link to this page
Your browser does not support the video tag.