Laserfiche WebLink
l\.UNUTES OF THE REGULAR ORONO CITY COUNCIL <br />~IEETING HELD ON OCTOBER 23, 1995 <br />(#5 -#2000 Conlen Cloutier -Continued) <br />Hurr questioned if the sewer unit has been paid. Mabusth said one sewer connection <br />charge is to be paid but the lateral and trunk charges have been paid against the property. <br />Two water units have also been paid. This does not include lot 3. Hurr noted that the <br />payment of sewer and water charge does not guarantee that the lot will be buildable. <br />Jabbour inquired about the boathouse on the propeny. Mabusth reported that if Cloutier <br />desires to make any changes to the boathouse, he must apply for a variance for structural <br />~mprovements. <br />Jabbour moved, Goetten seconded. to adopt Resolution#3621. Vote: Ayes 5, Nays 0. . . <br />Hurr clarified that the division of the property is not based on the connection with the <br />ownership between family members. .Mabusth concurred that th.is was not in the findings <br />oflhe resolution. <br />{*#6) #2051 MICHAEL HILBELINK, 2760 WATERTO\VN ROAD-FINAL <br />SUBDIVISION APPROVAL -RESOLUTION #3622 <br />Hurr moved, Goetten seconded, to approve Resolution #3622. Vote: Ayes 5, Nays 0. <br />(#7) #2041 PHIL AND DARCY OTTO, 4116 HIGHWOOD ROAD -AFTER THE <br />FACT CONDIDONAL USE PER.'VIIT -RESOLUTION #3623 <br />The Applicants were present. <br />Mabusth reported that the original variance application for new construction was <br />approved for a single access off of Highwood. The property contains steep elevations <br />requiring cuts to gain access to the garage. Retaining walls were shown on the original <br />plans. During construction, however, further excavation was performed, some during the <br />digging of the well and some due to the difficulty in maneuvering at west stall, which <br />resulted in two tiered retaining walls being constructed 4' from the lot line. A new curb <br />cut was also created., which has subsequently been approved by John Gerhardson. The <br />additional fill was placed in the side and rear yards. The drainage was a concern and a <br />catch basin was discussed. Gutters and downspouts with a tile funneling through to <br />another tile was added. There was a question on how to restore the bank without <br />encroaching the neighbor. The slope was restored with planting crown vetch and placing <br />a curlex blanket to stabilize the soils. The Engineer has signed off on this but will <br />reinspect during various stages of restoration. One such reinspecrion will occur before <br />seeding to look at the island area and the grades. The Engineer did approve the retaining <br />walls also. <br />5