My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3592
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 3500 - 3599 (November 28, 1994 - September 11, 1995)
>
Resolution 3592
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2015 2:55:04 PM
Creation date
11/18/2015 2:55:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r . <br /> . . <br /> � O� <br /> • O O <br /> b. - CITY of ORONO <br /> � � <br /> '�' RESOLUTION OF THE CITY COUNCIL <br /> ��`91�,E pg'�'� NO. `� .�A � � <br /> sx <br /> d. The applicant will be required to execute the standard Oversize Accessory <br /> Structure Covenant, which places limitations on the future subdivision of <br /> the property in order to ensure that the oversized accessory structure will <br /> not become non-conforming due to a future subdivision. <br /> e. The buildin� is proposed to be located 470' from the westerly lot line, <br /> . 640' from the northerly lot line, 800' from the southerly lot line, and <br /> 1200' from the easterly lot line. Section 10.20, Subdivision 3 (C) <br /> . requires a minunum 50' setback from any properry lines for such a <br /> structure. The proposed building is sufficiently distant from neighboring <br /> properties to have no significant impact on those properties. <br /> f. Because the portion of property between the proposed building location <br /> and the surrounding roads to the west and north is relatively open, it <br /> would be appropriate to require a vegetative screening plan be developed <br /> • to minimize the visual impact of the building as viewed from those roads. <br /> . g. The proposed land alteration to relocate fairways #15 and#16 involves the <br /> movement of approximately 1800 cubic yards of fill on the site, with no <br /> import or export of fill proposed. <br /> � h. No wetlands are involved in the project. However, there is the potential <br /> of creating a 3000-5000 s.f. pond on the upland as part of the fill <br /> balancing. Such pond will become an integral feature of the golf course. <br /> i. No changes are proposed to tees or greens at this time. The proposed <br /> work will be done in the Fall of 1995, and applicant has stated his intent <br /> to commence revegetation immediately so that the course is in condition <br /> to be playable in 1996. <br /> j. This proposal is part of a long-term master plan for improvements of the <br /> � course. However, this review only involves reconstruction of fairways <br /> #15 and #16 and the construction of the proposed storage building. <br /> Page 3 of 6 <br /> • . <br />
The URL can be used to link to this page
Your browser does not support the video tag.