My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
C
>
Casco Circle
>
3249 Casco Circle - 20-117-23-43-0008
>
Land Use
>
07-3276, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2026 1:45:06 PM
Creation date
5/28/2026 12:41:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, March 19, 2007 <br />6:00 o'clock p.m. <br />(#07-3276 Robert Luesse, Continued) <br />move the blocks in the area of the crack that he observed on the exterior of the house and that he has a <br />concern with constructing a new house on top of the existing foundation. <br />Curtis noted there is an engineering report that is included in the Commissioners' packets. <br />Luesse stated he was very careful to have the engineer check the items that Commissioner Kempf <br />referred to. Luesse stated the wing wall located on the north side of the house did move approximately <br />15 years ago and that he did put some pilaster in that area to support that section of the foundation. <br />Luesse stated he is interested in constructing the new residence on a solid foundation and that the <br />existing foundation is solid. <br />Winer inquired whether the applicant has considered rebuilding the entire house <br />Curtis stated the City Engineer has reviewed the report submitted by the applicant's engineer and that <br />the City Engineer did not note any specific concerns. <br />Zullo inquired whether the applicant should rebuild the lakeside decks. <br />Curtis stated those were mentioned in the report to allow the Planning Commission to discuss that item <br />as part of the overall application. <br />Zullo inquired whether the stairway and landings could be removed and replaced with one stairway <br />without the landings. <br />Curtis stated it could but that the applicant has the right to replace what is existing. Curtis stated the <br />second level porch and deck would be considered structure and that the applicant is proposing to fill that <br />area in as livable space. Curtis noted the structural coverage on the lot would not increase. <br />Curtis distributed a letter from Lucille Carlson, 3247 Casco Circle, regarding the project. Carlson has <br />indicated she does not object to the proposal to rebuild on the existing foundation, including adding a <br />second story. <br />Luesse stated he did discuss this project with the neighbor. <br />Rice moved, Winer seconded, to recommend approval of Application #07-3276, Robert G. Luesse, <br />3249 Casco Circle, granting of lot area and lot width variances; hardcover variances within the 0- <br />75 foot zone, the 75-250 foot zone, and the 250-500 foot zones; lot coverage variance, an average <br />lakeshore setback variance; and a side yard setback. VOTE: Ayes 7, Nays 0. <br />PAGE 31
The URL can be used to link to this page
Your browser does not support the video tag.