My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3664
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 3600 - 3699 (September 11, 1995 - March 11, 1996)
>
Resolution 3664
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2015 2:47:28 PM
Creation date
11/18/2015 2:47:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r_" ' , i. ,.:�l..) •- . . . . .. <br /> if <br /> .. , . _ . ,;4.?�'t ` . , • <br /> � O� <br /> � O O <br /> �b. - C ITY of ORONO <br /> � F . . <br /> �� G'�' RESOLUTION OF THE CITY COUNCII � <br /> . �`�kEsxo4`� Na 3 6 6 4 �� . <br /> � � � �a,`2. _ :-:�`ipplicant tishall• obtain a land:.alteration 'permit from the City of Orono prior to , , <br /> � . � . . •::a '.caininencement of constniction of the pond. . .r . <br /> � � �3.� ���After the contract is awarded by the applicant; the contractor will riotiFy the City of <br /> � " ��' Grono of hau?routes and disposal site. Any pernriits,required for tr�s process�w.ill be . <br /> responsiY,ility of the contractor. <br /> 4. Construction schedules shall be established and included in the bid documents aild <br /> such information transmitted to the City. � � <br /> 5.• - �- �:jA�p��l:icant's con�tr.acto.r..shall .keep the roads•�clean and..'sanded throu�hout �the • ;�, <br /> � , y -� •.�`corstnzction�process.'`ring�crs�n� shall�be stationed at the location�of�the ei�tras�c.e <br /> � - �•�� ':�to�the siie�or safeiy puiposes durit:g�all periods during wluch tiucks will be hauiiug. . . <br /> • 6.'��'""� •Applicant and cantractor shall l�013 aprec�nistr.uction conference��vith the C;ity. , , <br /> ' 7. Applicant shall°tratismit weekty"u�dates`on the construction�praeess to t11e Ciiy. +� , <br /> 8. Applicant shall re�air as necessary any local City roads used for the haul route. <br /> 9. Applica.nt shall establish parameters for stopping «-ork due to weather and safety <br /> concerns,to be coordinated with the Orono Public Works, Building � Zoning and <br /> . Police Departments. <br /> " 10. The applicant shall coordinate diseussions on pond maintenance in futur� meetings <br /> with Cit}�staff, and a suitable maintenance pro�ram shall be established prior to the <br /> City's issuance of the land alteration permit. <br /> 11. Any substantive changes affecti�g the efficiency of the Deer Hill Road ponds, or <br /> � wluch«�11 substantially affect the design of the County Road 6 detention pond, wzll <br /> �be cause for further review of this conditional use peranit. <br /> 12. 'Fhe property owner shall grant to the City a Flo�va`e and Conservation Easern�nt <br /> over the basin,to be granted prior;�o issuance of the required land alteration permit. <br /> � PaQe 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.