Laserfiche WebLink
• � <br /> � O� <br /> • O O <br /> b. � CITY of ORONO <br /> � ' ti <br /> '�' RESOLUTION OF THE CITY COUNCIL <br /> ���.kE o��G No. �3 6 3 2 � <br /> � SH <br /> 7. As a result of the replat, the Marfield property (proposed Lot 1) becomes a back <br /> lot with 45' required side setbacks rather than the 30' side setbacks normally <br /> required in the LR-lA District, making more of M�eld's residence structure <br /> non-conforming to the side setback requirements. Similarly, the Hill property <br /> (proposed Lot 2) becomes a front lot subject to a 50' side street setback along <br /> Outlot A, and 30' side setback along the common boundary line with proposed <br /> Lot 1. The replat results in revised setback requirements impacting proposed <br /> Lots 1, 2 and 3, which must be taken into account in future improvements to <br /> those properties. <br /> 8. The Council finds that it is appropriate to grant vaziances for the "front lot" and <br /> "back lot" non-conformities created by the rzplat. <br /> 9. Proposed Lots 1 and 2 will gain access to North Shore Drive via a shared <br /> idriveway located within Outlot A, at the current location of Scotch Pine Lane. <br /> Proposed Lot 3 will no longer gain access from Scotch Pine Lane but will create <br /> a new driveway access directly onto North Shore Drive approximately 200' east <br /> of the e�cisting Scotch Pine Lane intersection. Hennepin County Department of <br /> Public Works has given preliminary approval for this new driveway access. <br /> 10. The new shared driveway in Outlot A, the extension of the driveway to serve <br /> the proposed Lot 1, and the new driveway to be created for proposed Lot 3 have <br /> been designed to City of Orono residential street weight bearing capacity <br /> standards to provide adequate access for fire fighting equipment. Further, the <br /> Long Lake Fire Department has indicated the proposed driveway construction <br /> and proposed widths are sufficient for the necessary staging of fire fighting <br /> equipment. <br /> 11. The concurrent vacation of Scotch Pine Lane and all of the utility easements <br /> originally dedicated within the Dicon Addition, requires rededication of new <br /> utilin� easements for existing and future utility lines. The proposed rededication <br /> includes a 30' municipal sewer easement over the existing municipal sewer <br /> laterals within Scotch Pine Lane. Additional drainage and utility easements will <br /> be granted to accommodate Northern States Power and Minnegasco facilities on <br /> i Page 3 of 9 <br />