My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3707
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 3700 - 3799 (March 11, 1996 - November 12, 1996)
>
Resolution 3707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2015 2:04:09 PM
Creation date
11/18/2015 2:04:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> . i . <br /> � O� <br /> • O O <br /> �b- - CITY of ORONO <br /> � � <br /> �� , G'�' RESOLUTION OF THE CITY COUNCIL <br /> . �`��i'ESH.Og'� NO. �e� � Q� °� <br /> CONCLUSIONS, ORDER AND CONDITIONS <br /> Based upon one or more of the above findings, the Orono City Council hereby <br /> grants variances to Municipal Zoning Code Section 10.22, Subdivisions 1 (B) and 2, and'a <br /> conditional use pernut per Section 10.03, Subdivision 19 to permit the installation of a two=tiered <br /> timber retaining wall at a maximum height of 8' and grants a lakesh.ore setback variance of 6' or <br /> ' 8% and a hardcover variance of 114 s.f. or 19.8%, subject to the following conditions: <br /> 1. Prior to the City issuing a building permit for the construction of the retaining <br /> walls, applicants shall provide the following information to the City: <br /> A. Permit from Hennepin County Department of Transportation for work <br /> conducted within County right-of-way. <br /> � . B. Applicants' contractor to submit information on structural capacity of Helix <br /> Earth Anchors for review of City Engineer. <br /> C. Pernut application to include planting schedule for plantings to be installed <br /> at first and second tier of retaining walls. <br /> 2. Applicants' contractor shall contact Ciry staff at least 48 hours before installation <br /> of retauung walls. Applicants shall also be responsible for installing erosion <br /> control prior to construction and until walls are constructed and ground cover <br /> � restored. <br /> 3. Authorities granted by this resolution run with the property not with the owner, but <br /> are permissive only and must be exercised by application for a building permit <br /> within one year of the date of Council's approval, or the special conditions of this <br /> resolution will expire on that date (March 25, 1997). <br /> � Pa e 3 of 6 <br /> g <br />
The URL can be used to link to this page
Your browser does not support the video tag.