My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3835
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 3800 - 3899 (November 12, 1996 - May 12, 1997)
>
Resolution 3835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2015 1:13:10 PM
Creation date
11/18/2015 1:13:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� °� . <br /> � o 0 <br /> �b. � CITY of ORONO <br /> � � � � <br /> ti <br /> ��� �G'�' RESOLUTION OF THE CITY COUNCIL <br /> ' - �kESH�g' NO. � �2 � � <br /> landscaping improvements will be completed concurrently with the <br /> proposed site improvements. <br /> K. Applicants have agreed to providing the following site improvements which <br /> are required by the zoning code: <br /> 1) Sanitary facilities for slip customers, to be located within the new <br /> building. <br /> 2) Boat head pumpout facility. <br /> 3) Upgraded stormwater management facilities meeting NURP <br /> standards. <br /> � L. Applicants have agreed to provide these additional amenities to enhance the <br /> attractiveness of this site: <br /> 1) �Screening of the portable toilets which are intended to remain in use <br /> on the Tanager Lake side of Shoreline Drive. � <br /> 2) Building construction, facade and materials of a nature compatible <br /> _ with the residential nature of the surrounding neighborhoods. <br /> 3) Signage of a subdued nature to soften the visual impact of allowed <br /> signage. <br /> M. Applicants have agreed to a number of site operation conditions and <br /> limitations which will ensure that the operation of the site occurs in a <br /> manner that will minimize the impacts of the intensity of use proposed for <br /> the site, such conditions and limitations enumerated in the "Conclusions, <br /> Order and Conditions" section of this Resolution. <br /> N. The City engineer has conceptually approved the proposed stormwater plan <br /> subject to specific modifications in the plan. <br /> • Page 9 of 15 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.