My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3835
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 3800 - 3899 (November 12, 1996 - May 12, 1997)
>
Resolution 3835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2015 1:13:10 PM
Creation date
11/18/2015 1:13:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� °� <br /> i o 0 <br /> ���- � CITY of ORONO <br /> � � <br /> ti <br /> ��� �,~' RESOLUTION OF THE CITY COUNCIL <br /> � �kESHOg'�Y NO. � � a`� :5 -� <br /> b. Upgraded stormwater management facilities per the approved plan. <br /> c. Sanitary facilities for slip customers, located within the new building. <br /> d. Boat head pumpout facility. <br /> e. Screening of portable toilets to be continued in use on west side of Shoreline <br /> Drive, subject to design approval by City staff. <br /> � f. Building construction, facade and materials per the construction plan <br /> attached as Exhibit C. <br /> g. Landscaping improvements per the approved plan. <br /> � h. Signage per the general design and construction as shown in Exhibit C. <br /> 2. Property owner shall execute a Developer's Agreement and post a Letter of Credit <br /> (150% of cost of required improvements) with the City to ensure the following <br /> improvements are fulfilled upon installation of the expanded parking azea and <br /> stormwater improvements: <br /> A. Stormwater management improvements per final plan subject to approval <br /> by the Minnehaha Creek Watershed District and the City of Orono. The <br /> City Engineer has requested the following amendments to the grading and <br /> stormwater plan: <br /> 1) Storm sewer inlet invert should be set at elevation 929.4. The <br /> invert of the existing outlet pipe should be extended to elevation <br /> 928.0 on the pond side to provide skimming of floatables and <br /> debris. <br /> 2) The grading plan should be revised to show a drainage swale near <br /> � the pond outlet pipe set at the pond high water level elevation <br /> 930.8. <br /> � Page 11 of 15 �" <br />
The URL can be used to link to this page
Your browser does not support the video tag.