Laserfiche WebLink
Keep all heavy equipment off of the proposed treatment area before and <br />after construction as much as possible. The treatment area should be <br />marked off before construction. <br />With proper installation and maintenance, th3• {stem should have no <br />problem in treating septic effluent effectil <br />Recommend to pump the septic tank every year if there is only 1 tank <br />& every 2 years if there are 2 tanks. <br />Q <br />Steven B. Schirmers of <br />SBS/ds <br />