My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3820
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 3800 - 3899 (November 12, 1996 - May 12, 1997)
>
Resolution 3820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 3:31:00 PM
Creation date
11/18/2015 1:09:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� °� � <br /> � o 0 <br /> �b_ � CITY of ORONO <br /> � � � <br /> ti <br /> ��� ��'�' RESOLUTION OF THE CITY COUNCIL <br /> �kESH�g' NO. � � � O <br /> CONCLUSIONS, ORDER AND CONDITIONS <br /> Based upon one or more of the above findings, the Orono City Council hereby <br /> grants variances to Municipal Code Section 10.56, Subdivision 16 to allow live tree removal, , <br /> grading, filling and excavation within 75' of the Ordinary High Water Level of the protected <br /> tributary known as Painter Creek where no such activity is normally allowed, and has requested <br /> a conditional use permit and variance per Municipal Zoning Code Section 10.55 for land <br /> alterations within a floodway and flood fringe; and has requested a conditional user permit per <br /> Section 10.03, Subdivisions �19-21 for excavation in excess of 100 cubic yards; the above <br /> . conditional use permits and variances to allow the expansion of an existing wet detention basin <br /> for the purpose of sediment and nutrient removal from the aforesaid protected tributary, subject <br /> to-the following conditions: , � <br /> 1. Maintenance and expansion of the South Katrina Basin shall substantially conform <br /> • to the submitted plans for said basin, consisting of Sheets 1-5 of the Minnehaha <br /> Creek Watershed District Painter Creek Maintenance and Improvement Project. <br /> �. <br /> 2. Applicant shall work with the Painter's Woods Homeowners Association to ensure <br /> that the interests of said association are addressed and satisfied. <br /> 3. , Applicant shall obtain a land alteration permit from the City of Orono prior to <br /> commencement of the maintenance and improvement project. <br /> 4. Applicant and contractor shall hold a pre-construction conference with the City. <br /> 5. A haul route map and construction schedule must be submitted to the City for <br /> approval prior to commencing work. <br /> 6. Applicant shall be responsible for cleaning the surface and/or repairing any paved <br /> street (public or private) that becomes soiled or dainaged due to the construction <br /> activities on this project. <br /> 7. For safety reasons, in tiines of inclement weather or early thaw, the City shall have _ <br /> the authority to stop all hauling activity on the project until such time that the City <br /> � determines necessary. <br /> • <br /> Page 5 of 9 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.