Laserfiche WebLink
I <br />rM <br />6.17. During tF. progress of the Work, CONTRACTOR <br />shall keep the premises free from accumulations of waste ma <br />terials, rubbish and other debris resulting from the Work. At <br />the completion of the Worl CONTRACTOR shall remove all <br />waste materials, rubbish and debris from and about the prem- <br />ises as well as all tools, appliances, construction equipment <br />and machinery, and surplus materials, and shall leave the site <br />clean and ready for occupancy by OWNER. CONTRACTOR <br />shall restore to their original condition those portions of the <br />site not designated for alteration by the Contract Documents. <br />6.18. CONTRACTOR shall not load nor permit any part <br />of any structure to be loaded in any manner that will endanger <br />the structure, nor shall CONTRACTOR subject any part of <br />the Wotk or adjacent property to stresses or pressures that <br />will endanger it. <br />Record Documents: <br />6.19. CONTRACTOR shall keep one record copy of all <br />Specifications, Drawings, Addenda, Modifications, Shop <br />Drawings and samples at the site, to good order and an- <br />notated to show all changes made during the construction <br />process. These shall be available to ENGINEER for exam- <br />ination and shall be delivered to ENGINEER for OWNER <br />upon completion of the Work. <br />Safety and Protection: <br />6.20. CONTRACTOR shall be responsible for initiating, <br />maintaining and supervising all safety precautions and pro- <br />grams in connection with the Work. CONTRACTOR shall <br />take all necessary precautions for the safety of, and shall pro- <br />vide the necessary protection to prevent damage, injury or <br />loss to. <br />6.20.1. all employees on the Work and other persons <br />who may be affected thereby, <br />6-20.2. all th- Work and all materials or equipment to <br />be incorporated therein, whether to storage on or off the <br />site. and <br />t04 6.20.3 other property at the .ite or adjacent thereto <br />Irta including tree%, shrubs, lawns, walks, pavements, road <br />ways, structures and utilities not lestgna(ed for remosal <br />relmation or replacement in the c r,irse of construction. <br />No <br />CONTRACTOR shall comply with , J applicable laws, ordi- <br />nances, titles, regulations and orders of any public body hav- <br />ing jurisutction for the safety of persons or property or to pro- <br />tect them fron damage, injury or loss; and shall erect and <br />maintain al ^ssary safeguards for such safety and protec- <br />tion CONT TOR shall notify owners of adjacent prop- <br />erty and + when prosecution of the Work may affect <br />them ",II e, injury or loss to any property referred to to <br />paragra 2 or 6.20 3 caused, dtrectiv or tndtrectly, to <br />whole u )art, by CONTRACTOR, any Subcontractor or <br />anvon: wrectly or indirectly emploved by any of them or <br />anvo,ne for whose acts any of them may he Hable. shall he <br />remedied by COI`, f RACTOR (except damage or loss attribut- <br />able to the fault of Drawings or Specifications or to the acts or <br />omissions of OWNER or ENGINEER or anyone employed by <br />either of them or anyone for whose acts either of t..em may be <br />liable, and not attrthutable, directly or indirectly, in whole or <br />in part, to the t,,ult or negligence of CONTRACTOR). <br />CONTRACTOR duties and responsibilities for the safety <br />and protection of the Work snail continue until such time as <br />all the Work is completed and ENGINEER has issued a notice <br />to OWNER and CONTRACTOR in accordance with para- <br />graph l4.I: that the Work is acceptable. <br />6.21. CONTRACTOR shall designate a responsible <br />member of his organization at the site whose duty shall be the <br />prevention of accidents. This person shall be CONTRAC- <br />TOR'S superintendent unless otherwise d--iignated in writing <br />by CONTRACTOR to OWNER. <br />Emergencies: <br />6.22. In emergencies affecting the safety or protection of <br />persons or the Work or property at the site or adjacent there- <br />to. CONTRACTOR, without special instruction or authoriza- <br />tion from ENGINEER or OWNER, is obligated to act to pre- <br />vent threatened damage, injury or loss. CONTRACTOR shall <br />give ENGINEER prompt written notice of any significant <br />changes to the Work or deviations °rom the Contract Docu- <br />ments caused therebv. <br />Shop Drawings and Samples: <br />6.23. After checking and v_nfytng all field measurements, <br />CONTRACTOR shall submit to ENGINEER for review and <br />approval, to accordance with the accepted schedule of Shop <br />Drawing submissions (see paragraph ZA). tive copies (unless <br />otherwise specified in the General Requirements) of all Shop <br />Drawings, which shall have been checked by and stamped <br />with the approval of CONTRACTOR and identified as <br />ENGINEER may require. The data shown on the Shop Draw- <br />ings will be complete with respect to dimensions, design cri- <br />teria, materials of construction and like information to enable <br />ENGINEER to review the information as required. <br />6.23. CC" I AACTOR shall also submit to ENGINEER <br />for review and approval with such promptness as to cause no <br />delav to Work, all samples required by the Contract Docu- <br />ments Att samples wtl! have been [necked by and stamped <br />with the approval of CONTRACTOR, identified clearly as to <br />material. manufacturer, any pertinent catalog numbers and <br />the use for which intended <br />6 25 -Ni the time of each submission. CONTRACTOR <br />shall in writing call ENGINEFR's attention to any deviations <br />that the Shop Drawings or samples may have from the <br />requirements of the Contract Documents. <br />h.26 ENGINEER will review and approve with reason- <br />able promptness Shop Drawings and samples. but ENGI- <br />NEER's review and approval shall he only for conformance <br />with the destgnconcept of the Protect and for compliance with <br />the information given in the Contract Documents and shall <br />not ­xtend to means, methods, sequences, techniques or pro- <br />