My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
420 Brown Road South - 03-117-23-42-0010
>
Land Use
>
83-735, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 1:32:37 PM
Creation date
4/17/2026 1:28:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21.2 Completion of W(,rk. <br />21.2.1. By submitting a Bid, and execution of the Agreement, the Bidder <br />(and Contractor) expressly agrees the time (or times for various phases) for <br />completion is reasonable, considering all factors. The Bidder (and Contractor) <br />further represents he has: analyzed the Project, including the equipment, materials <br />and methods; considered his own capabilities and work load; determined availability <br />of qualified me:hanics and unskilled labor; considered the time of year for <br />commencement of work, made a reasonable allowance for weather variations and other <br />potential delays encountered in the construcrion process; the condition of the <br />site; considered the constraints specified; evaluated the effects of other <br />contractors who may be on the site; and has taken these and other relevant <br />factors bearing on the progress of the work into account. <br />21.2.3. Each Bidder _s required to z h_= _'._e of f-ill _ompietion of <br />a!' fork on th i3 Pr , ject. <br />21.2.+. The Work shall be completed on or before IZ. IQPI <br />unless otherwise agreed in writingbj Owner and Bidder 'Conra-� ctor in accordance <br />with Article 12 of the General Conditions. In the event that 3idd- r (Contractor) <br />fails to complete the project within the time period specified, Owner shall have <br />the right to pursue arbitration in accordance With the provisions of Article 15 <br />of the General Conditions, and Bidder (Contractor) shall be responsible to <br />Owner for the reasonable cost of pursuing arbitration proceedings, including <br />reasonable attorneys fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.