My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Legal review
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
1025 Brown Road South - 10-117-23-24-0001
>
Land Use
>
99-2495, SUBD FINAL
>
Legal review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 2:52:39 PM
Creation date
4/16/2026 2:52:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Westwood Professional Services, Inc, <br />April 26, 1999 <br />.Jim Hafner <br />Minnehaha Creek Watershed District <br />Gray Freshwater Center, Navarre <br />2500 Shady Oak Road, Suite 37 <br />Excelsior, MN 55331 <br />RE: Carriage Hill, Orono <br />Project No. 98795 <br />Dear Mr- Hafner: <br />Ci 1 Y kaf- tliiUjV0 <br />104 Marty Drive, Suite 3 <br />Buffalo, MN 55313 <br />Phone:612-682-2587 <br />Fax: 612-682-2639 <br />Toll Free: 1-888-682-2587 <br />Email: wps®westwoocips,com <br />Please find enclosed Grading, Drainage & Street Construction Plans for the above <br />referenced project. The enclosed plans incorporate both City of Orono and Minnehaha <br />Creels Watershed District review comments. A brief overview of changes is included <br />below. <br />After a review of our preliminary plat submission drawings, the MCWD requested <br />several revisions to our drawings. These changes include: <br />■ Labeling the pond's 10:1 safety bench. This was incorporated into the <br />drawings by providing a pond detail, shown on page 1/3. <br />• The silt fence detail has been corrected to show 24" driven depth, 4' stake <br />spacing for unsupported fence, and 8' stake spacing for supported fence. <br />• Grading notes now include both a revegetation schedule, and a note for silt <br />fence removal. <br />• 11"x17" reductions have been included along with signed full size sets. <br />Beyond the MCWD changes, the City of Orono's engineering consultant, Bonestroo <br />Rosene Anderlik, & Assoc., has required an outlet structure that provides 1-foot of <br />skimming to remove floatables and debris. We have added the outlet control structure, <br />including a submerged outlet, to provide skimming. Along with this change, we propose <br />the removal of the existing 12" CMP outlet, and the installation of an 18" CMP in its <br />place. As you may recall, we proposed using the existing 12" CMP in conjunction with a <br />new 15" CMP in our preliminary drawings. Because of the required outlet control <br />structure, a one pipe outlet system is a better choice for both economic and aesthetic <br />reasons. Pond routing calculations, incorporating the new outlet, have been enclosed as <br />an addendum to our previously submitted stormwater management calculations. <br />Designing the Future Toddy ...since 19-72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.