Laserfiche WebLink
I i\. I > I \ I UL; AL ~ L \iv AGL I I{ Lt\ I M LI'< l ~ \ ~ i UVl V\, Uh. h. :-, l l LL l <br />' ,\ <br />B <br />( <br />!J. <br />E. <br />F. <br />FLOW <br />Fstunated __ J__~_ . gpd <br />measured ____ x -······---,= -··---gpd <br />SEPTIC TANK VOLUME <br />~ e., i3t!>O gallons <br />SOILS (Sill' evaluation data}. <br />Depth to restricting layer= ___ __'i~~':L_Q__ feet <br />Maximum depth of system C -3 ft = \ 7...'' /.() fl'l'l <br />Texture ;fe~ri lo'lltl Percolation rate B ~ 2'; MP! <br />SSF h12_ sq t/ gpd <br />TRENCH BOTTOM AREA <br />z <br />H. For trenches with 6 inches of rock below the pipe: <br />A x F = __ x __ = __ sq ft of bottom area <br />I. For trenches with 12 inches of rock below the pipe: <br />Ax F x 0.8 = __ x __ x 0.8 = __ sq ft of bottom area <br />J. For trenches with 18 inches of rock below the pipe: <br />A x F x 0.66 = __ x __ x 0.66 = __ sq ft of bottom area <br />K. For trenches with 24 inches of rock below the pipe: <br />A x F x 0.6 = __ x ___ x 0.6 = __ sq ft of bottom area <br />BED BOTTOM AREA <br />L For yravity beds with 6 or 12 inches of rock below the pipe; <br />1.5 x Ax F = 1.5 x __ x __ = __ sq ft of bottom area <br />For Pressure beds with 6 or 12 inches of rock below the pipe; <br />Ax F = x __ = __ sq ft of bottom area <br />ROCK VOLUME IN CU Ff <br />M. Rock depth below distribution pipe plus 0.5 foot times bottom area: <br />M =Rock depth + 6 inches x Area (H,I,J,L,K) <br />( __ + 0.5 ft) X __ = __ CU ft <br />. ROCK VOLUME IN CU YDS <br />N< "--volume in cu ft divided by 27 <br />0. <br />p <br />Q. <br />R. <br />s <br />M + 27 cu yds + 27 = __ cu yds <br />ROCK WEIGHT <br />Cubic yards times 1.4 = tons <br />N x 1.4 = tons X 1.4 = <br />DISTRIBUTION <br />tons <br />(Chec]s..one based on slope) __ Bed(< 6% slope) <br />Trenches _V_D Drop boxes (any slope) __ Distribution box(< 3%) <br />SYSTEM LENGTH <br />Select width= ft <br />Divide bottom area by width: (H, I, J, or K) + P = lineal feet <br />= lineal feet <br />Gravelless Pipe <br />( 10" :Ax F + 3)= Lineal Feet ( 8" :Ax F + 2)= Lineal Feet <br />Chamber (Ax F + width of chamber) <br />]!i;Lx I.Z.7 +~=~lineal feet <br />LAWN AREA <br />Select trench spacing, center to center= S-feet <br />Multiply trench spacing by lineal feet Rx Q = sq ft of lawn area <br />____ X __ = JS'j[) sq ft <br />LAYOUT (Use other side) <br />1. Select an appropriak sc;1le; one square=~---f(,(•I <br />2. Show pertinent prnpt'rly boundaries, right-of-way, l'3Sl'll1L'nh. <br />1. Show location of housL', garage, driveway, and all other <br />improvements, existing or proposed <br />4. Show location and layout of se\•vage treatment systvin <br />5. Show location of water supply well. <br />6. Dimension all set backs and separation distances. <br />_ -~~~~~~!-~r~_Srwagt~_t:·!~_,w in -~~alh,n_~-~-~~!!.av {gr<J) <br />Numlw, <br />of Type I Type II Type 111 Type I\' Bedrooms <br />2 300 12.'l 180 t-,(11,i 1 450 JOO 218 .. , <br />4 6()() J75 256 the <br />5 750 450 294 \'~uo. <br />in 6 9()() .~2~ 1J2 lhl' <br />7 1050 (,()() 17() olhC'r <br />8 1200 67~ ·IOX <br />(·,,tunu1, <br />Number Minimum Minimum <br />Scptir Tanl-Capacity with of l.1qu1d Garbage <br />Bedrooms Capac 11, Disposal <br />()!allon!-) (gallons) <br />2 or less 750 1.125 <br />3 or4 1.000 1.500 <br />5 or6 1.500 2.250 <br />7 or 8 2,000 3,000 <br />over9 Sec fig. C-6 (X 1.5) <br />Soil Charo1ctcrislic~ & Ht;>,1u1n-..i An•,\~ 1t,r ~•w.tit• Treatment <br />Pt.>rcola110n R..-l!t> 5-quJ.r.-lncl ~IS..n, <br />St,il Te)._ture r,.-1,:_.;l\,,n ,..-,d.io}' Minuit.>:. per inch , .... fJ.l\ l'<'ri-qu;,,,... <br />(mp;l ltt• <br />Faster than 0.1 • ~oarse Sand ---------- <br />0.1 toS Sand 0.83 1.20 <br />0.1 toS Fine Sand"" 1.67 0.60 <br />6 to 15 r,andyLoam 1.27 0.79 <br />16 to 30 Loam 1.67 0.60 <br />31 to 45 Silt Loam 2.00 0.50 <br />461060 ClatLoam 2.20 0.45 <br />Slower than 60* .. la)' ----(0.24) <br />• Soil too c~ for Sl'wagt: tn~atment. u~ systems for rapidly pcr~tiable soils. <br />•• Soil having 50'}'., or mort' of hnc or \'ery fine sand. <br />,... Soil wilh tou high a percentage o( clay for <br />installation of an ingnmnd standard system.