Laserfiche WebLink
CITY OF ORONO <br />CARRIAGE HILL SUBDIVISION <br />RESIDENTIAL SITE DEVELOPMENT <br />PLAT FILE NO. 2467 <br />SITE IMPROVEMENT COST ESTIMATE <br />ITEM <br />Mobilization <br />Site grading <br />Common Excavation <br />Aggregate base, Cl. 5, 100% crushed <br />Type 41 bit. wear course <br />Remove existing bituminous <br />Bituminous street patching <br />Pond excavation <br />1811 CMP <br />1811 CMP apron <br />Remove existing CMP <br />Outlet control structure <br />Rip rap, Cl. 3 <br />Silt fence <br />Retaining wall <br />Seeding with 4 11 topsoil <br />Sod with 4 11 topsoil <br />Estimated Construction Cost <br />+50% Security Deposit <br />Total Security Deposit Required <br />UNIT <br />LS <br />LS <br />CY <br />TN <br />TN <br />SY <br />SY <br />LS <br />LF <br />EA <br />LF <br />EA <br />CY <br />LF <br />SF <br />AC <br />SY <br />EST. <br />QUANTITY <br />1 <br />1 <br />2100 <br />1125 <br />500 <br />55 <br />55 <br />1 <br />137 <br />4 <br />1 <br />1 <br />12 <br />3000 <br />800 <br />1.0 <br />3000 <br />2467CARRIAGE HILL <br />UNIT <br />PRICE <br />$5,000.00 <br />5,000.00 <br />6.00 <br />10.00 <br />35.00 <br />1.00 <br />12.00 <br />5,000.00 <br />20.00 <br />150.00 <br />1,300.00 <br />1,800.00 <br />50.00 <br />3.00 <br />15.00 <br />3,000.00 <br />2.50 <br />EST. <br />COST <br />$5,000 <br />5,000 <br />12,600 <br />11,250 <br />17,500 <br />55 <br />660 <br />5,000 <br />2,740 <br />600 <br />1,300 <br />1,800 <br />600 <br />9,000 <br />12,000 <br />3,000 <br />7,500 <br />$95,605 <br />47,803 <br />$143,408