Laserfiche WebLink
BWSR NOD Form – November 12, 2019 1 <br /> <br />Minnesota Wetland Conservation Act <br />Notice of Decision <br />Local Government Unit: Minnehaha Creek Watershed District County: Hennepin <br />Applicant Name: Ethan De Naray Applicant Representative: Anderson Engineering – Alex Yellick <br />Project Name: 860 Brown Road South, Orono LGU Project No. (if any): W21-058 <br />Date Complete Application Received by LGU: 09/13/2021 <br />Date of LGU Decision: 10/18/2021 <br />Date this Notice was Sent: 10/18/2021 <br /> <br />WCA Decision Type - check all that apply <br />☒ Wetland Boundary/Type ☐ Sequencing ☐ Replacement Plan ☐ Bank Plan (not credit purchase) <br />☐ No-Loss (8420.0415) ☐ Exemption (8420.0420) <br /> Part: ☐ A ☐ B ☐ C ☐ D ☐ E ☐ F ☐ G ☐ H Subpart: ☐ 2 ☐ 3 ☐ 4 ☐ 5 ☐ 6 ☐ 7 ☐ 8 ☐ 9 <br /> <br />Replacement Plan Impacts (replacement plan decisions only) <br />Total WCA Wetland Impact Area: <br />Wetland Replacement Type: ☐ Project Specific Credits: <br /> ☐ Bank Credits: <br />Bank Account Number(s): <br /> <br />Technical Evaluation Panel Findings and Recommendations (attach if any) <br />☒ Approve ☐ Approve w/Conditions ☐ Deny ☐ No TEP Recommendation <br /> <br />LGU Decision <br />☐ Approved with Conditions (specify below)1 ☒ Approved1 ☐ Denied <br /> List Conditions: <br />Decision-Maker for this Application: ☒ Staff ☐ Governing Board/Council ☐ Other: <br /> <br />Decision is valid for: ☒ 5 years (default) ☐ Other (specify): <br /> <br />1 Wetland Replacement Plan approval is not valid until BWSR confirms the withdrawal of any required wetland bank credits. For project- <br />specific replacement a financial assurance per MN Rule 8420.0522, Subp. 9 and evidence that all required forms have been recorded on <br />the title of the property on which the replacement wetland is located must be provided to the LGU for the approval to be valid. <br /> <br />LGU Findings – Attach document(s) and/or insert narrative providing the basis for the LGU decision1. <br />☐ Attachment(s) (specify): <br />☒ Summary: Site was field reviewed by Anderson Engineering (Alex Yellick), Board of Water & Soil Resources <br />(Ben Carlson), and the Minnehaha Creek Watershed District (Cole Thompson). The boundaries and types <br />identified in the delineation report for this property were reviewed and verified. The TEP has no comments <br />based on the information provided, and approves the Boundary and Type of the wetlands noted. <br /> <br />1 Findings must consider any TEP recommendations. <br /> <br />Attached Project Documents <br />☒ Site Location Map ☐ Project Plan(s)/Descriptions/Reports (specify): <br />