Laserfiche WebLink
b. When an existing code system is repaired or expanded, such ISTS shall remain a code <br />system. Compliant systems, when repaired, shall be upgraded to a code system status <br />whenever such classification is reasonably attainable. <br />(4) Construction procedures. <br />a. Protection of drainfield area. Proposed drainfield areas shal l be identified and marked off <br />on the lot at the time of the site evaluation and prior to any construction or grading <br />occurring in the area. The drainfield area shall remain undisturbed until drainfield <br />construction is commenced. No vehicular traffic shall be allowed in the drainfield area <br />either before or after drainfield installation. <br />b. Favorable weather required. Drainfield area or trench construction must not proceed if the <br />area is wet or has had rain within 48 hours. Mound or trench construction shall not proceed <br />unless the soil moisture content is below the plastic limit. <br />c. Construction inspection required. The contractor issued a permit for ISTS construction shall <br />perform all work according to the design specifications approved by the city for each <br />particular ISTS. All subsurface work, including building sewer, sewage tanks, distribution <br />system and soil treatment area shall be inspected by the city inspector prior to backfilling <br />or covering of any portion thereof. It shall be the responsibility of the contractor to notify <br />the city at least 24 hours prior to the time an inspection will be required, and it shall be the <br />responsibility of the contractor to ensure that the inspection is accomplished and the <br />construction is approved prior to any backfilling, covering or continuation of the <br />construction. <br />(Code 1984, § 12.30(5); Ord . No. 100 2nd series,§ 4, 2-10-1992; Ord . No. 147 2nd series,§§ 11-15, 5- <br />13 -1996; Ord. No . 199 2nd series, § 1(12.30(5)), 5-8-2000; Ord. No. 38 3rd series,§ 1, 9-24-2007) <br />Sec. 78-420. -Area, height, lot width and yard requirements. <br />(a) Height. No structure or building in the RR -1B district shall exceed 2½ stories and shall not exceed 30 <br />feet in height except as provided in section 78-1366 . <br />(b) Lots . The following minimum requirements shall be observed: <br />Side Yard <br />Lot Lot Front Side Rear <br />Area Width Yard Yard <br />Adjacent <br />Yard <br />(feet) <br />to Street <br />I <br />(acres) (feet) (feet) <br />(feet) <br />(feet) <br />l 2 200 so 30 so so <br />Sec. 78-1434. -Area restrictions. <br />In all R districts, no accessory building shall exceed 1,000 square feet of footprint area; except that <br />accessory structures in excess of 1,000 square feet will be allowed under the following conditions: <br />(1) Not more than one oversized accessory structure (OAS) shall be permitted on any property. An <br />oversi zed accessory structure is defined as an accessory structure of footprint area in exces s of <br />1,000 square feet, except that the following non roofed accessory structures whi ch exceed 1,000 <br />Page 4