My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
440 Brown Road South - 03-117-23-42-0012
>
Land Use
>
16-3872, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 11:54:14 AM
Creation date
4/16/2026 11:53:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />~onday, October 17, 2016 <br />6:30 o'clock p.m. <br />prop owne s agreeing to <br />wit m the app oval reso ion and submittal f add' · <br />TE: Ayes 5 <br />6. #16-3872 REVISION, LLC, ON BEHALF OF TIMOTHY AND AMY SULLIVAN 440 <br />BROWN ROAD SOUTH, VARIAN CE, 6:50 P.M. -6:55 P .M. <br />Alex Lang with Revision, LLC, and Timothy and Amy Sullivan, Applicants , were present. <br />Curtis stated the applicants are the new owners of the property and wish to construct a l ,200 square foot <br />detached accessory building which will resemble a barn in appearance. The building is proposed to be set <br />back approximately 175 feet from the front lot line. The home is set back approximately 220 feet. All <br />other setbacks and zoning requirements will be met. Due to the location of the building to the house, a <br />setback variance is required. <br />The two and a half acre property is allowed to have a maximum accessory structure of l ,200 square feet. <br />Oversized accessory structure covenants w ould be required. <br />The building official has completed his review of the septic system fo r thi s project and has also requested <br />additional information from the applicants to make his final determination . Hi s comments have been <br />included in the Planning Commission packet. Any outstanding septic issues must be resolved prior to <br />issuance of the building permit. <br />Staff has provided an analysis of the practical difficulties within the Staff report. The applicant has <br />completed the practical difficulties analysis form and the Planning Commission may ask for additional <br />testimony regarding this application or discuss the practical difficulty criteria. <br />Staff finds that the location of the existing home, septic sites, and wetland/pond on the property make <br />locating a conforming accessory structure, particularly an OAS in the size as permitted, difficult. The <br />impact of a 1,200 square foot two-story barn will be mitigated by both the existing wooded areas and the <br />separation between the barn building and the homes on adjacent properties. <br />No public comments have been received regarding this application. <br />Planning Staff recommends approval of the variance subject to the property owners agreeing with the <br />oversize accessory covenants. <br />The Planning Commission had no ques tions for Staff. <br />Timothy Sullivan, Applicant, stated he could answer any questions . <br />Chair Thiesse opened the public hearing at 6 :53 p.m. <br />There were no public comment s regarding this application . <br />Chair Thiesse closed the public h earing at 6:53 p .m . <br />Page 5 of 19
The URL can be used to link to this page
Your browser does not support the video tag.