Laserfiche WebLink
I <br />VanEeckhout Building Corporation <br />Attention: Mr. Chuck i'anEeckhout tt..:;;,cr <br />The mound should have a pressure distribution system. Pressurr <br />can be accomplished either with an electric pump in a pumping chanher set <br />near the mound at the bottom of the slope or with a siphon in a camber -,VL .it <br />the top of the slope. <br />If you k ve any questicns, please fccl free to contact me. <br />Sincerely, <br />PAWSON ANDERSON ASSOCIATES, INC. <br />Gary J. Raiun, Soil Scientist <br />C;JK/ jkw <br />Enclosures <br />File: 691.02 <br />