My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
85 Brown Road South
>
Land Use
>
78-372, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2026 11:41:21 AM
Creation date
4/7/2026 11:38:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGULAR MEETING OF THE ORONO COUNCIL, JUNE 15, 1978 Page 5 <br />Staff Note - May 16, 1978 SUBDIVISION <br />85 Brown Road South <br />Applicant is preparing revised map and septic (Continued) <br />information as requested by Planning Commission. <br />Council Meeting - June 15, 1978 <br />Butler moved, Paurus seconded, to approve the <br />preliminay subdivision request of Lloyd S. Kelley, <br />85 Brown Road South, per the Planning Commission <br />recommendations of May 8, 1978. Motion, Ayes (4) - <br />yays (0) . <br />Mr. Alan Olson, City Planner, entered into the SUBDIVISION <br />record the following request of Jurgen Stielow, 565 Leaf Street <br />565 Leaf Street, for a subdivision dated April 4, #367 <br />1978, which states: Jurgen Stielow <br />Sketch Plan Review: This is a proposed 13 lot <br />residential subdivision of the former Andromeda <br />property between Leaf Street and Bayside Road. <br />The sketch plan is an opportunity for you to <br />review and comment on the proposal at the conceptual <br />stage. <br />Items for discussion: Wetlands and flowage ease- <br />ments along shore and pond; riparian access; <br />int-,*ions for the existing church building on <br />Lot mnd foundation on Lot 7; should the road <br />be E is or private, and should it be gravel or <br />paved': <br />Planning Commission Meeting - April 10, 1.978 <br />Planning Commission reviewed sketches indicated <br />some objection to substandard area of Lot 10, <br />Block 1 and setbacks of existing structures from <br />proposed lot lines on alternate plan dated April 6, <br />1978. Suggested developer revise plans to meet <br />m.iimum area and setback requirements. Indicated <br />preference and conceptual approval of original <br />proposal. (Plan dated March 27, 1978) <br />Staff: Developer will be submitting revised plans <br />for second sketch plan review <br />Planning Commission Meeting April 24, 1978 <br />Mr. Stielow was present at this meeting and the <br />Planning Commission reviewed his latest plan which <br />is dated April 20, 1978. This plan has been <br />rearranged to show response to the -nncerns and <br />questions of the Planning Cuuunission at, the )ast <br />meeting. General discussion followed during which <br />the Planning Commission noticed considerable work <br />and improvements over the previous plats. (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.