My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Survey & Site Plan Requirements
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
925 Brown Road North - 27-118-23-34-0001
>
Land Use
>
16-3812, VAR
>
Survey & Site Plan Requirements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 1:16:48 PM
Creation date
4/2/2026 1:16:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*Certification exemption: The certification of the plan by a licensed professional maybe exempted by the city <br />engineer if the project meets all of the following: <br />1) An existing survey accurately describes existing property conditions; <br />2) Proposed project exceeds the setback requirements by 150%; <br />3) Proposed project footprint does not exceed 200 square feet; <br />4) Evidence that the Average Lakeshore setback is met is provided; and <br />5) Information necessary to ensure the project conforms to City codes and ordinances, including hardcover, <br />grading, and landscaping requirements is provided. <br />Additional surveys may be required, depending on the nature and complexity of your project. <br />Foundation survey: A foundation survey, when indicated on the building permit, shall be submitted upon <br />completion of the foundation work for all buildings and all additions to buildings and include: <br />1. Verification of the lot dimensions, <br />2. Verification front, side, rear, lakeshore, and wetland setbacks, <br />3. Foundation elevation at the same locations depicted on the survey developed for the project. <br />As -built survey: An as -built survey, where required, shall <br />1. Certify the final topography of the site; <br />2. Verify drainage patterns; <br />3. Verify hardcover calculations. <br />4. Certify all existing improvements <br />Lake Classen <br />Dickey Lake <br />French Lake <br />North Basin <br />Sewage Lagoon <br />South Basin <br />974.5 <br />985.5 <br />930.5 <br />934.3 <br />930.0 <br />Kocreanonai ueveiopment JKU) L8Ke8 <br />100 75 75 <br />Long. Lake <br />Mooney Lake <br />9880 <br />Tanager Lake <br />929.4 <br />Hadley Labe (Plymouth) <br />9614 <br />General Development (GD) Lakes <br />75 75 75 <br />Forest Lake <br />929.4 <br />Lake M[nnetonka <br />929.4 <br />Tributary Streams <br />100 75 - 75 <br />Dickey Lake Creek d .. <br />Long Lake Creek : <br />Painters Creek <br />(measured from tap of bank) <br />Stubbs Bay Creek <br />Wolsfeld Creek <br />Updated: August 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.