My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
809 Brown Road North - 27-118-23-34-0006
>
Land Use
>
96-2092, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 10:51:29 AM
Creation date
4/2/2026 10:50:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING, INC. Steven 8. Schirmers -MPCA Cert. No. 627 <br />951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br />Dennis Platteter <br />809 No. Brown Rd. <br />Lot 1, Block 1 <br />Orono, Henn. Co., MN <br />November 15, 1995 <br />This On-Site Sewage Treatment System is Designed for a Type 1, five <br />bedroom home Designed in accordance with the Minnesota Pollution <br />Control Agency Chapter 7080 and local ordinances. <br />The soils ~n this site are a clay loam. The seasonally saturated <br />soils were located at 12" to 24" below the ground surface. Due <br />to the seasonally saturated soil, a Pressurized Mound System will <br />need to be installed to treat septic effluent. <br />This site has an existing Non-Conforming System with the bottom <br />less than 3' from mottled soil. The existing tank may be used <br />if water tight, if new construction the existing tank will need <br />to be abandoned, pumped & filled with soil. <br />The soils at a depth of 12" have a percolation rate averaging <br />15.5 min/inch. <br />A pumping chamber will need to be installed to lift the effluent <br />to the treatment area. <br />The manifold and supply line pipe must have back drainage to the <br />pumping chamber. The distribution pipes shall have their ends <br />capped~ Be sure the rock and sand fill material are clean. The <br />sod layer below the entire mounded area must be turned over, just <br />break up the sod, be sure not to over work. <br />The power supply and switches must be located outside the manhole <br />and pumping chamber in a weather proof enclosure. A warning device <br />must be installed with a light and sound device, this is in case of <br />a pump failure. <br />All neighboring wells are located greater than 75' away from the <br />proposed treatment area. <br />Keep all heavy equipment off of the proposed treatment area before <br />and after construction. The treatment area should be marked off <br />before construction. This Design is not valid & the system will <br />need to be relocated if failure to protect the areas proposed <br />for On-Site Sewage Treatment occurs. <br />CONT'D
The URL can be used to link to this page
Your browser does not support the video tag.