My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
809 Brown Road North - 27-118-23-34-0006
>
Land Use
>
97-2306, SUBD
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2026 10:43:18 AM
Creation date
4/2/2026 10:42:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN 06'97 13:53 FR NRG LEGAL <br />December 30, 1996 <br />Nls Jeanne Mabus th <br />City of Orono <br />2750 Kelley Park.--way <br />Orono, tvfN 55356 <br />,-1-:i,-1 <br />,_) ( ,_) <br />RE: Replatting of 809 North Brown Road <br />Dear Jeanne~ <br />5392 TO 94730510 <br />Due to the increment weather this fall~ we were not able to remove the pole <br />barn as required by the City Council prior to filing of the final plot plan. <br />The removal needs to be done a contractor experienced in pole ban1 <br />building. There is a limited number of qualified contractors and they are all <br />busy trying to finish jobs from last fall. <br />Also each Realtor and builder we contacted indicated that the preliminary <br />lot line detracted significantly from the marketability of the front lot. They <br />recommended that the line be realigned so that the front lot view could not <br />be affected by o\.vner of the rear lot. l have explained that the current septic <br />sites affected that lot aITangement. Their suggestion was to relook at the <br />possible sites. <br />For those reasons, we need to extend our platting for the property. We <br />would appreciate an extension through July l 997 to give time (and better <br />weather) to remove the pole barn and select altenmtive workable septic <br />sites. <br />I wanted to discuss this with you in person, but between my job related <br />travel schedule and our whole family contracting. We appreciate your <br />assistance. <br />F'. 02/ [12 <br />** TOTAL PAGE.002 **
The URL can be used to link to this page
Your browser does not support the video tag.