My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-1987 Council Packet
Orono
>
City Council
>
1987
>
06-22-1987 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2026 12:21:37 PM
Creation date
3/30/2026 12:07:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOERENBERG MEMORIAL COUNTY PAk,, <br />Revis,J Cost Estimate - 5 August ig�5 <br />1. This consists of an updated cost estimate for <br />the basic support services <br />as discussed in the Draft Report of rlarcn 14, <br />1985. <br />50 Car Parki,g Lot <br />$ 43,662 <br />1800 Square Feet Visitor Center <br />180,000 <br />Water Distribution System <br />10C 000 <br />Memorial Arbor - 832 Square Feet <br />23,870 <br />Utilities <br />30,000 <br />Plantings (east side of property) <br />25,000 <br />TOTAL <br />$4'57— <br />2 Features which should be developed to provide <br />a minimal, but useable <br />display garden. <br />Grading and Demolition <br />$ 14,923 <br />Terrace, Walls and Steps at Visitor Center <br />11,649 <br />Brick Pathways <br />95,069 <br />4 is and Steps <br />19,656 <br />Trellis in Garden <br />3,30C <br />TOTAL <br />$144,597— <br />Planting; for Remainder of Property <br />$123,887 <br />Including floral display areas) <br />TOTAL OF DEVELOPMENT IN NO. 1 AND NO. 2 <br />T67T, Ub- <br />3. Additional features which would complete the <br />development as indicated on <br />the plans. <br />Arbor at Vi sito.- Center <br />S 13 - 00 <br />Walled Garden <br />30,000 <br />Curb Edging in Garden <br />1,400 <br />Lime,tcl ^ Pathway with Steps <br />10,000 <br />W•, r Feature <br />100,000 <br />Exteric• "ence and Gate <br />52,500 <br />Screen Gazebo <br />3,000 <br />Lake Edge Rip -Rap <br />4.000 <br />SUB- T')TAi <br />� <br />$214. TM <br />1TAL TO COMPLETE DEVELOPMENT AS SHOW" UN PLANS $885,116 <br />NUiE: Thee estimated costs represent construction costs in 1985 dollars <br />only; and do not include fees, charges end contingency. fit; <br />
The URL can be used to link to this page
Your browser does not support the video tag.