My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-1987 Council Packet
Orono
>
City Council
>
1987
>
06-22-1987 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2026 12:21:37 PM
Creation date
3/30/2026 12:07:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. I ' <br />A. City of Orono Approval of Noerenberg Memorial County Park Master Plan <br />On Monday, June 9, 1986, the Orono City Council voted 4-0 to approve <br />the District's plan for Noerenberg Park. Specifically requested was <br />approval of the plan as permitted within this land use zone and a <br />variance to the C1t,v's Ordinance to allow hard cover within 75' of <br />the lakeshore. <br />The Council deliberated for 1 1/2 hours on the issue a.' -anted <br />approval with the following conditions: <br />o Initial parking be limited to 26 hard surface spaces. <br />o The remaining 24 spaces to be surfaced when the building is <br />built or as need dictates. <br />o Elimination of the designated IOC --car "overflow" parking area <br />on the North side of County Road 51. <br />o That resale not occur on an ongoing basis in the building. <br />(We Indicated th4t sales would be garden related art, boors, <br />etc. but not food or beverage. The Council felt that sales <br />would make the area too commercial and clutter the site.) <br />o The building size and function was specified. Any changes in <br />scale or function need to be returned to the Council for <br />further review. <br />The grading, access and other engineering/design aspects of the plan <br />are now going to the Minnehaha Creek Watershed District and Hennepin <br />County epartment of Transportation. Approval is anticipated. <br />Pursuant to earlier Board action. we will continue to work with the <br />Foundation on this project for fund-raising act4vity. Concurrently, <br />we will be detailing cost estimates including preparation of detailed <br />plans for 1st phase construction which includes: <br />o The Memorial Arbor <br />o Landscape plantings to the East <br />o Parking and grading <br />o Site utilities, including modifications to the irrigation <br />system <br />We anticipate .that available dollars for capital funding from the <br />Noerenberg Trust will total $224,0OO as of March 1, 1987. We expect <br />that mos., of this work can be done within that amount. If the <br />Foundation pursues fund raising fe• Noerenberg development will <br />proceed where funding is available. uirst phase construction w+ll <br />occur during 1987. <br />
The URL can be used to link to this page
Your browser does not support the video tag.