My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1420 Bracketts Point Road
>
Land Use
>
95-2048, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2026 9:14:37 AM
Creation date
3/26/2026 9:14:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #2048 <br />August 14, 1995 <br />Page 2 <br />Issues for Consideration <br />1. Applicant cannot be expected to install on-site septic systems (main residence and <br />accessory structure) during the construction season of 1995 if sewer extension is <br />approved by City and project ordered in 1996. What is a reasonable deadline for <br />installation of septic should Comprehensive Plan process fail '95/'96? Should all <br />use of studio apartment or other units cease until sewer issue is resolved? <br />2. Applicant should be placed on notice that additional residential units will be <br />assessed for sewer. It is not clear as to how each of these units will be assessed <br />but this will be a consideration during the assessment hearings for sewer. <br />3. Other issues raised by Planning Commission. <br />Staff Addendum <br />The applicant will file an amended conditional use permit involving an earlier application dealing <br />with repairs to the retaining wall at entrance door to a tunnel that provides access to the lower <br />level of the green house. It appears that a tree has been removed in the 0-75' setback area and <br />that applicant proposes removal of all earth that surrounds the tunnel for purpose of <br />waterproofing. These land alterations will occur in the 0-75' setback area. This was never <br />made clear to the City in the original application information submitted with the conditional use <br />permit application. <br />Planning Commission Recommendation <br />To approve conditional use permit requesting a studio apartment within the oversized accessory <br />structure that will contain a total of six bedrooms, subject to the following conditions: <br />ch <br />1. Applicant to obtain a building permit to permit the installation of the studio <br />apartment within the upper level of the oversized accessory structure. <br />2. Deadline date for on-site septic installation should sewer petition fail. Should use <br />of accessory residential units cease until an approved sanitary disposal system is <br />installed on property?
The URL can be used to link to this page
Your browser does not support the video tag.