Laserfiche WebLink
(AP <br />TO: <br />FROM: <br />DATE: <br />SUBJ : <br />_'I1 8 198 7 <br />Mayor Grabek <br />Orono Council Members <br />City Administrator Bernhardson <br />Jeanne A. Mabusth, Zoni.,q Administrator <br />June 1, 1.987 <br />#1103 Howard Ei_singer, 3245 Wayzata Blvd. - <br />Conditional Use Permit - Resolution <br />List of Exhibits - <br />A - Braun Engineering Letter <br />B - Council Notice of Action <br />At Council's request, Mr. Eisinger's contractor, John Gannon has <br />submitted the existing test data of 1974 to the original <br />engineering firm that conducte(; the tests. Review Exhibit A, <br />Braun Engineering states as follows: <br />"it is our opinion that t►.•_ proposed addition of f .ve feet <br />of r•ineral - 'I above the top of the existing landfill <br />grades prese a very slight risk of shear failure." <br />The following reasons are cited: <br />1. Past. experience with similar landfill sites situated <br />within a wetland. <br />2. Existing landfill material probably possesses high <br />internal angle of friction and a high shear strength based <br />on existing conditions. <br />3. Settlement that has occurred over the past _ years will <br />also increase the shear strength of the iApp.,r i zone of <br />organic soils and will lessen risk of shear :A- m result of <br />placing an additional surcharge load. <br />Staff has met with both Eisin3er and Ganno-i to discuss the final <br />preparatory steps required so that the permit at the 100,000 <br />cubic yard level may be approved by Council. <br />As Braun Engineering has suggested, we will ask that monitoring <br />plates, minimum of 3, he placed along the edges of the fill area. <br />Staff will be able to observe these plates upon inspections to <br />determine if there is an abnormal rate of settlement. <br />Staff has advised Gannon ,-hat the City will require a developer's <br />agreement and appropriate security to insure that final grading <br />and seeding will be completed even if the fill project as <br />proposed is not. realized. <br />The Engineer's recommendations regarding erosion control, <br />inspect ion schedu 1 e .and mon i t or i ny f i l l Fero jest have a l so been <br />referenced in this resoll,.ion. <br />