My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#1866 Septic Report & Inspection - Main House
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1400 Bracketts Point Road - 11-117-23-32-0025
>
Land Use
>
93-1866, CUP
>
#1866 Septic Report & Inspection - Main House
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 2:25:10 PM
Creation date
3/19/2026 2:24:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE EVALUATION REPORT <br />For Kraus Anderson <br />Sewage Treatment System <br />GENERAL INFORMATION <br />This design is for a Type 1, 4 bedroom home and in accordance with the Minnesota Pollution <br />Control Agency Standards and local ordinances. <br />A seasonally high water table was evidenced at 24 inches of depth in Soil Boring 7. The slope <br />is about 3%. <br />The soils at a depth of 12 in Test Hole 8 has a percolation rate of 13 minutes per inch. All <br />neighboring wells are located more than 100' away from the proposed treatment area. <br />NOTES: <br />Keep all heavy equipment off the proposed treatment area before and after construction as much <br />as possible. The treatment area should be marked off before construction. <br />With proper installation and maintenance this system should have no problem in treating septic <br />effluent effectively. <br />It is recommended that the septic tanks be pumped every 2 years. <br />MOUND SYSTEM: <br />Flow: 4 bedroom = 150 gallon/day/bedroom 150 x 4 = 600 gallons per day. <br />600 GPD x .83 = 500 square feet. <br />10-foot wide rock bed 50 feet long = 500 square feet <br />CONSTRUCTION EQUIPMENT: <br />A rubber-tired tractor may be used for plowing or disking to prepare the soil surface but in no <br />case shall a rubber-tired tractor be used after the surface preparation is completed. A crawler <br />or tract-type tractor shall be used for mound construction. <br />SOIL SURFACE PREPARATION: <br />The discharge pipe from the pump to the mound area shall be installed prior to soil surface <br />preparation. The trench excavated to install. the discharge pipe shall be carefully backfilled and <br />compacted to prevent seepage of effluent. <br />PAGE2
The URL can be used to link to this page
Your browser does not support the video tag.